Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft
The development of the crosscut from the aspect of mine surveying is a specific task, since there is no possibility for an independent control of its construction during the development. This is primarily related to the long crosscuts where the deviations of the designed direction of crosscut would...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining and Geology, Belgrade
2015-01-01
|
Series: | Podzemni Radovi |
Subjects: | |
Online Access: | http://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2015/0354-29041527023B.pdf |
_version_ | 1818354099269140480 |
---|---|
author | Božinovska Tamara Milutinović Aleksandar Gojković Zoran Ganić Aleksandar |
author_facet | Božinovska Tamara Milutinović Aleksandar Gojković Zoran Ganić Aleksandar |
author_sort | Božinovska Tamara |
collection | DOAJ |
description | The development of the crosscut from the aspect of mine surveying is a specific task, since there is no possibility for an independent control of its construction during the development. This is primarily related to the long crosscuts where the deviations of the designed direction of crosscut would have significant consequences on safety and technological activities in the mine shaft. In order to avoid errors, it is necessary to perform the preceding analysis of the crosscut accuracy, where the overall standard deviation of the crosscut is calculated. This value must be smaller than the given allowed deviation. The paper presents an a priori evaluation of the accuracy of the crosscut to be developed in the brown coal mine 'Soko' for the purpose of ventilating the opening rooms of the eastern part of the deposit. |
first_indexed | 2024-12-13T19:20:02Z |
format | Article |
id | doaj.art-41134e1b73144b3aa808508da30ae6ce |
institution | Directory Open Access Journal |
issn | 0354-2904 |
language | English |
last_indexed | 2024-12-13T19:20:02Z |
publishDate | 2015-01-01 |
publisher | Faculty of Mining and Geology, Belgrade |
record_format | Article |
series | Podzemni Radovi |
spelling | doaj.art-41134e1b73144b3aa808508da30ae6ce2022-12-21T23:34:11ZengFaculty of Mining and Geology, BelgradePodzemni Radovi0354-29042015-01-01201527233010.5937/podrad1527023B0354-29041527023BApriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaftBožinovska Tamara0Milutinović Aleksandar1Gojković Zoran2Ganić Aleksandar3JP PEU 'Resavica', RMU 'Soko' Čitluk, SokobanjaUniversity of Belgrade, Faculty of Mining and Geology, Belgrade, SerbiaUniversity of Belgrade, Faculty of Mining and Geology, Belgrade, SerbiaUniversity of Belgrade, Faculty of Mining and Geology, Belgrade, SerbiaThe development of the crosscut from the aspect of mine surveying is a specific task, since there is no possibility for an independent control of its construction during the development. This is primarily related to the long crosscuts where the deviations of the designed direction of crosscut would have significant consequences on safety and technological activities in the mine shaft. In order to avoid errors, it is necessary to perform the preceding analysis of the crosscut accuracy, where the overall standard deviation of the crosscut is calculated. This value must be smaller than the given allowed deviation. The paper presents an a priori evaluation of the accuracy of the crosscut to be developed in the brown coal mine 'Soko' for the purpose of ventilating the opening rooms of the eastern part of the deposit.http://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2015/0354-29041527023B.pdfmine surveyingcrosscutapriori accuracy evaluation |
spellingShingle | Božinovska Tamara Milutinović Aleksandar Gojković Zoran Ganić Aleksandar Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft Podzemni Radovi mine surveying crosscut apriori accuracy evaluation |
title | Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft |
title_full | Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft |
title_fullStr | Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft |
title_full_unstemmed | Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft |
title_short | Apriori evaluation of the crosscut accuracy in a horizontal plane between GVH-1 and VU-1 of the RMU 'Soko' mine shaft |
title_sort | apriori evaluation of the crosscut accuracy in a horizontal plane between gvh 1 and vu 1 of the rmu soko mine shaft |
topic | mine surveying crosscut apriori accuracy evaluation |
url | http://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2015/0354-29041527023B.pdf |
work_keys_str_mv | AT bozinovskatamara apriorievaluationofthecrosscutaccuracyinahorizontalplanebetweengvh1andvu1ofthermusokomineshaft AT milutinovicaleksandar apriorievaluationofthecrosscutaccuracyinahorizontalplanebetweengvh1andvu1ofthermusokomineshaft AT gojkoviczoran apriorievaluationofthecrosscutaccuracyinahorizontalplanebetweengvh1andvu1ofthermusokomineshaft AT ganicaleksandar apriorievaluationofthecrosscutaccuracyinahorizontalplanebetweengvh1andvu1ofthermusokomineshaft |