THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION

At present a great attention is paid to increasing of energy efficiency at operated electrified urban transport. Perspective direction for increasing energy efficiency at that type of transport is the application of regenerative braking. For additional increasing of energy efficiency there were sugg...

Full description

Bibliographic Details
Main Author: A. A. Sulim
Format: Article
Language:Russian
Published: Belarusian National Technical University 2014-08-01
Series:Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
Subjects:
Online Access:https://energy.bntu.by/jour/article/view/826
_version_ 1797879803026604032
author A. A. Sulim
author_facet A. A. Sulim
author_sort A. A. Sulim
collection DOAJ
description At present a great attention is paid to increasing of energy efficiency at operated electrified urban transport. Perspective direction for increasing energy efficiency at that type of transport is the application of regenerative braking. For additional increasing of energy efficiency there were suggested the use of capacitive drive on tires of traction substation. One of the main task is the analysis of energy recovery application  with drive and without it.These analysis demonstrated that the calculation algorithms don’t allow in the full volume to carry out calculations of amount and cost of energy recovery without drive and with it. That is why we see the current interest to this topic. The purpose of work is to create methods of algorithms calculation for definite amount and cost of consumed, redundant and recovery energy of electrified urban transport due to definite regime of motion on wayside. There is algorithm developed, which allow to calculate amount and cost of consumed, redundant and recovery energy of electrified urban transport on wayside during the installation capacitive drive at traction substation. On the basis of developed algorithm for the definite regime of wagon motion of subway there were fulfilled the example of energy recovery amount and its cost calculation, among them with limited energy intensity drive, when there are 4 trains on wayside simultaneously.
first_indexed 2024-04-10T02:53:01Z
format Article
id doaj.art-414e905a89064e229517f7fb0e0f65df
institution Directory Open Access Journal
issn 1029-7448
2414-0341
language Russian
last_indexed 2024-04-10T02:53:01Z
publishDate 2014-08-01
publisher Belarusian National Technical University
record_format Article
series Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
spelling doaj.art-414e905a89064e229517f7fb0e0f65df2023-03-13T07:41:49ZrusBelarusian National Technical UniversityIzvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika1029-74482414-03412014-08-01043041818THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATIONA. A. Sulim0Украинский научно-исследовательский институт вагоностроенияAt present a great attention is paid to increasing of energy efficiency at operated electrified urban transport. Perspective direction for increasing energy efficiency at that type of transport is the application of regenerative braking. For additional increasing of energy efficiency there were suggested the use of capacitive drive on tires of traction substation. One of the main task is the analysis of energy recovery application  with drive and without it.These analysis demonstrated that the calculation algorithms don’t allow in the full volume to carry out calculations of amount and cost of energy recovery without drive and with it. That is why we see the current interest to this topic. The purpose of work is to create methods of algorithms calculation for definite amount and cost of consumed, redundant and recovery energy of electrified urban transport due to definite regime of motion on wayside. There is algorithm developed, which allow to calculate amount and cost of consumed, redundant and recovery energy of electrified urban transport on wayside during the installation capacitive drive at traction substation. On the basis of developed algorithm for the definite regime of wagon motion of subway there were fulfilled the example of energy recovery amount and its cost calculation, among them with limited energy intensity drive, when there are 4 trains on wayside simultaneously.https://energy.bntu.by/jour/article/view/826энергия рекуперацииэлектрифицированный городской транспортнакопительтяговая подстанция
spellingShingle A. A. Sulim
THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
энергия рекуперации
электрифицированный городской транспорт
накопитель
тяговая подстанция
title THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
title_full THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
title_fullStr THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
title_full_unstemmed THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
title_short THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION
title_sort calculation of the energy recovery electrified urban transport during the installation drive for traction substation
topic энергия рекуперации
электрифицированный городской транспорт
накопитель
тяговая подстанция
url https://energy.bntu.by/jour/article/view/826
work_keys_str_mv AT aasulim thecalculationoftheenergyrecoveryelectrifiedurbantransportduringtheinstallationdrivefortractionsubstation
AT aasulim calculationoftheenergyrecoveryelectrifiedurbantransportduringtheinstallationdrivefortractionsubstation