A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty

Port operations have been suffering from hybrid uncertainty, leading to various disruptions in efficiency and tenacity. However, these essential uncertain factors are often considered separately in literature during berth and quay crane assignments, leading to defective, even infeasible schedules. T...

Full description

Bibliographic Details
Main Authors: Zhu Wang, Junfeng Cheng, Hongtao Hu
Format: Article
Language:English
Published: MDPI AG 2024-01-01
Series:Journal of Marine Science and Engineering
Subjects:
Online Access:https://www.mdpi.com/2077-1312/12/1/182
_version_ 1797343256795676672
author Zhu Wang
Junfeng Cheng
Hongtao Hu
author_facet Zhu Wang
Junfeng Cheng
Hongtao Hu
author_sort Zhu Wang
collection DOAJ
description Port operations have been suffering from hybrid uncertainty, leading to various disruptions in efficiency and tenacity. However, these essential uncertain factors are often considered separately in literature during berth and quay crane assignments, leading to defective, even infeasible schedules. This paper addressed the integrated berth allocation and quay crane assignment problem (BACAP) with stochastic vessel delays under different conditions. A novel approach that combines both proactive and reactive strategies is proposed. First, a mixed-integer programming model is formulated for BACAP with quay crane maintenance activities under the ideal state of no delay. Then, for minor delays, buffer time is added to absorb the uncertainty of the arrival time of vessels. Thus, a robust optimization model for minimizing the total service time of vessels and maximizing the buffer time is developed. Considering that the schedule is infeasible when a vessel is seriously delayed, a reactive model is built to minimize adjustment costs. According to the characteristics of the problem, this article combined local search with the genetic algorithm and proposed an improved genetic algorithm (IGA). Numerical experiments validate the efficiency of the proposed algorithm with CPLEX and Squeaky Wheel Optimization (SWO) in different delay conditions and problem scales. An in-depth analysis presents some management insights on the coefficient setting, uncertainty, and buffer time.
first_indexed 2024-03-08T10:45:09Z
format Article
id doaj.art-4221172bf5aa41978826ff5a2ad467a6
institution Directory Open Access Journal
issn 2077-1312
language English
last_indexed 2024-03-08T10:45:09Z
publishDate 2024-01-01
publisher MDPI AG
record_format Article
series Journal of Marine Science and Engineering
spelling doaj.art-4221172bf5aa41978826ff5a2ad467a62024-01-26T17:17:47ZengMDPI AGJournal of Marine Science and Engineering2077-13122024-01-0112118210.3390/jmse12010182A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid UncertaintyZhu Wang0Junfeng Cheng1Hongtao Hu2Logistics Engineering College, Shanghai Maritime University, Shanghai 201306, ChinaLogistics Engineering College, Shanghai Maritime University, Shanghai 201306, ChinaLogistics Engineering College, Shanghai Maritime University, Shanghai 201306, ChinaPort operations have been suffering from hybrid uncertainty, leading to various disruptions in efficiency and tenacity. However, these essential uncertain factors are often considered separately in literature during berth and quay crane assignments, leading to defective, even infeasible schedules. This paper addressed the integrated berth allocation and quay crane assignment problem (BACAP) with stochastic vessel delays under different conditions. A novel approach that combines both proactive and reactive strategies is proposed. First, a mixed-integer programming model is formulated for BACAP with quay crane maintenance activities under the ideal state of no delay. Then, for minor delays, buffer time is added to absorb the uncertainty of the arrival time of vessels. Thus, a robust optimization model for minimizing the total service time of vessels and maximizing the buffer time is developed. Considering that the schedule is infeasible when a vessel is seriously delayed, a reactive model is built to minimize adjustment costs. According to the characteristics of the problem, this article combined local search with the genetic algorithm and proposed an improved genetic algorithm (IGA). Numerical experiments validate the efficiency of the proposed algorithm with CPLEX and Squeaky Wheel Optimization (SWO) in different delay conditions and problem scales. An in-depth analysis presents some management insights on the coefficient setting, uncertainty, and buffer time.https://www.mdpi.com/2077-1312/12/1/182berth allocation and quay crane assignmentvessel delayproactive-reactivelocal searchgenetic algorithm
spellingShingle Zhu Wang
Junfeng Cheng
Hongtao Hu
A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
Journal of Marine Science and Engineering
berth allocation and quay crane assignment
vessel delay
proactive-reactive
local search
genetic algorithm
title A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
title_full A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
title_fullStr A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
title_full_unstemmed A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
title_short A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
title_sort proactive reactive based approach for continuous berth allocation and quay crane assignment problems with hybrid uncertainty
topic berth allocation and quay crane assignment
vessel delay
proactive-reactive
local search
genetic algorithm
url https://www.mdpi.com/2077-1312/12/1/182
work_keys_str_mv AT zhuwang aproactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty
AT junfengcheng aproactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty
AT hongtaohu aproactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty
AT zhuwang proactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty
AT junfengcheng proactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty
AT hongtaohu proactivereactivebasedapproachforcontinuousberthallocationandquaycraneassignmentproblemswithhybriduncertainty