Analisis Perbandingan Metode Just In Time dan Economic Order Quantity

UD Surabaya Rattan Industry as the middle scale of company is produced rattan chairs. This company is based on the job order to plan and develop the future company to its business strategy become mass production. In process production, the company always faces problems in the row material supply. If...

Full description

Bibliographic Details
Main Author: Adi Santoso
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2010-02-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://ejournal.umm.ac.id/index.php/industri/article/view/6222
_version_ 1818915744767803392
author Adi Santoso
author_facet Adi Santoso
author_sort Adi Santoso
collection DOAJ
description UD Surabaya Rattan Industry as the middle scale of company is produced rattan chairs. This company is based on the job order to plan and develop the future company to its business strategy become mass production. In process production, the company always faces problems in the row material supply. If the row material supply is saved in long time period and there is bulking in storage it can make the rattans will be under level quality. The purpose of this research is giving information about the choosing methods of planning, controlling the row material supply with differ between Just in Time (JIT) method with Economic Order Quantity (EOQ) to minimize inventory value. The result of from chosen method for the planning of inventory control of raw material. Total Inventory Cost (TIC) which in it there are three element of it expense of that is expense of purchasing, expense of ordering, and also stock holding cost got TIC for the Method of Just in Time (JIT) period 13 to Rp233.129.629,71. While for the Method of Economic Order of Quantity (EOQ) at period 13 to Rp234,171,969.21. Calculation of Total Inventory Cost (TIC) as a whole ( period of time 1 year) by applying Method of Just In Time ( JIT) it can be seen Totalize Inventory Cost (TIC) Rp5,012,483,943.59 while by applying Economic Order of Quantity (EOQ) from Total of Inventory Cost (TIC) Rp518,088,399.86. Becoming method planning of inventory control the selected method of Just In Time (JIT) with thrift equal to Rp5,604,456.27.
first_indexed 2024-12-20T00:07:09Z
format Article
id doaj.art-427478a8bbb047f1b6f78477dadd45c4
institution Directory Open Access Journal
issn 1978-1431
2527-4112
language English
last_indexed 2024-12-20T00:07:09Z
publishDate 2010-02-01
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
record_format Article
series Jurnal Teknik Industri
spelling doaj.art-427478a8bbb047f1b6f78477dadd45c42022-12-21T20:00:37ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122010-02-0110171210.22219/JTIUMM.Vol10.No1.7-124708Analisis Perbandingan Metode Just In Time dan Economic Order QuantityAdi SantosoUD Surabaya Rattan Industry as the middle scale of company is produced rattan chairs. This company is based on the job order to plan and develop the future company to its business strategy become mass production. In process production, the company always faces problems in the row material supply. If the row material supply is saved in long time period and there is bulking in storage it can make the rattans will be under level quality. The purpose of this research is giving information about the choosing methods of planning, controlling the row material supply with differ between Just in Time (JIT) method with Economic Order Quantity (EOQ) to minimize inventory value. The result of from chosen method for the planning of inventory control of raw material. Total Inventory Cost (TIC) which in it there are three element of it expense of that is expense of purchasing, expense of ordering, and also stock holding cost got TIC for the Method of Just in Time (JIT) period 13 to Rp233.129.629,71. While for the Method of Economic Order of Quantity (EOQ) at period 13 to Rp234,171,969.21. Calculation of Total Inventory Cost (TIC) as a whole ( period of time 1 year) by applying Method of Just In Time ( JIT) it can be seen Totalize Inventory Cost (TIC) Rp5,012,483,943.59 while by applying Economic Order of Quantity (EOQ) from Total of Inventory Cost (TIC) Rp518,088,399.86. Becoming method planning of inventory control the selected method of Just In Time (JIT) with thrift equal to Rp5,604,456.27.http://ejournal.umm.ac.id/index.php/industri/article/view/6222just in time, economic order quatity, inventory
spellingShingle Adi Santoso
Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
Jurnal Teknik Industri
just in time, economic order quatity, inventory
title Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
title_full Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
title_fullStr Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
title_full_unstemmed Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
title_short Analisis Perbandingan Metode Just In Time dan Economic Order Quantity
title_sort analisis perbandingan metode just in time dan economic order quantity
topic just in time, economic order quatity, inventory
url http://ejournal.umm.ac.id/index.php/industri/article/view/6222
work_keys_str_mv AT adisantoso analisisperbandinganmetodejustintimedaneconomicorderquantity