Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban

The land availability in public cemeteries in Tuban currently under pressure towards the land capacity which is getting limited due to the population growth and inadequate facilities. This study, using the calculation to get the estimated area and the land capacity of the public cemetery in Tuban. T...

Full description

Bibliographic Details
Main Authors: Arwi Yudhi Koswara, Eko Budi Santoso, Abdul Afif, Teti Hariyati, Sutikno Sutikno, Ema Umilia, Prianti Prianti, Rahel Putri Pamungkas, Chichik Ilmi Annisa
Format: Article
Language:English
Published: Diponegoro University 2021-08-01
Series:Tataloka
Subjects:
Online Access:https://ejournal2.undip.ac.id/index.php/tataloka/article/view/10341
_version_ 1828130746630406144
author Arwi Yudhi Koswara
Eko Budi Santoso
Abdul Afif
Teti Hariyati
Sutikno Sutikno
Ema Umilia
Prianti Prianti
Rahel Putri Pamungkas
Chichik Ilmi Annisa
author_facet Arwi Yudhi Koswara
Eko Budi Santoso
Abdul Afif
Teti Hariyati
Sutikno Sutikno
Ema Umilia
Prianti Prianti
Rahel Putri Pamungkas
Chichik Ilmi Annisa
author_sort Arwi Yudhi Koswara
collection DOAJ
description The land availability in public cemeteries in Tuban currently under pressure towards the land capacity which is getting limited due to the population growth and inadequate facilities. This study, using the calculation to get the estimated area and the land capacity of the public cemetery in Tuban. The data compilation steps consists of primary survey and secondary survey. The primary survey activities carried out included field surveys and community aspirations which were carried out through in-depth interviews and Focus Group Discussions (FGD). Meanwhile, the secondary survey was conducted to find data, namely basic data on laws and policies, and data on social demographic conditions. The analytical method used is the analysis of grave needs by analyzing the projection of the mortality rate, calculating the need for cemetery land area per year, calculating the remaining land area for the cemetery, calculating the remaining land capacity of the cemetery, and calculating the remaining capacity of the cemetery with a one-time overlapping system. From the results of the analysis, it is obtained that the remaining capacity of the burial ground in Tuban District will be filled in 2021 and will require an additional land area of 617,945 m2 (61 Ha) in 2030. Semanding and Merakurak Districts are projected to be full in 2025 with a land area requirement of 81,589 m2 (8.1 Ha) and 113,875 m2 (11 Ha) in 2030 Palang District will be full in 2026 and Jenu District will be full in 2028.
first_indexed 2024-04-11T16:36:46Z
format Article
id doaj.art-4300ce5af3ce432a8a4f0070400eec3c
institution Directory Open Access Journal
issn 0852-7458
2356-0266
language English
last_indexed 2024-04-11T16:36:46Z
publishDate 2021-08-01
publisher Diponegoro University
record_format Article
series Tataloka
spelling doaj.art-4300ce5af3ce432a8a4f0070400eec3c2022-12-22T04:13:47ZengDiponegoro UniversityTataloka0852-74582356-02662021-08-0123343043710.14710/tataloka.23.3.430-4374765Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan TubanArwi Yudhi Koswara0Eko Budi Santoso1Abdul Afif2Teti Hariyati3Sutikno Sutikno4Ema Umilia5Prianti Prianti6Rahel Putri Pamungkas7Chichik Ilmi Annisa8Institut Teknologi Sepuluh Nopember, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaPemerintah Kabupaten Tuban, IndonesiaPemerintah Kabupaten Tuban, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaInstitut Teknologi Sepuluh Nopember, IndonesiaThe land availability in public cemeteries in Tuban currently under pressure towards the land capacity which is getting limited due to the population growth and inadequate facilities. This study, using the calculation to get the estimated area and the land capacity of the public cemetery in Tuban. The data compilation steps consists of primary survey and secondary survey. The primary survey activities carried out included field surveys and community aspirations which were carried out through in-depth interviews and Focus Group Discussions (FGD). Meanwhile, the secondary survey was conducted to find data, namely basic data on laws and policies, and data on social demographic conditions. The analytical method used is the analysis of grave needs by analyzing the projection of the mortality rate, calculating the need for cemetery land area per year, calculating the remaining land area for the cemetery, calculating the remaining land capacity of the cemetery, and calculating the remaining capacity of the cemetery with a one-time overlapping system. From the results of the analysis, it is obtained that the remaining capacity of the burial ground in Tuban District will be filled in 2021 and will require an additional land area of 617,945 m2 (61 Ha) in 2030. Semanding and Merakurak Districts are projected to be full in 2025 with a land area requirement of 81,589 m2 (8.1 Ha) and 113,875 m2 (11 Ha) in 2030 Palang District will be full in 2026 and Jenu District will be full in 2028.https://ejournal2.undip.ac.id/index.php/tataloka/article/view/10341analysis of cemetery needscemetery capacitypublic cemetery
spellingShingle Arwi Yudhi Koswara
Eko Budi Santoso
Abdul Afif
Teti Hariyati
Sutikno Sutikno
Ema Umilia
Prianti Prianti
Rahel Putri Pamungkas
Chichik Ilmi Annisa
Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
Tataloka
analysis of cemetery needs
cemetery capacity
public cemetery
title Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
title_full Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
title_fullStr Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
title_full_unstemmed Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
title_short Analisis Kebutuhan Pembangunan Tempat Pemakaman Umum di Perkotaan Tuban
title_sort analisis kebutuhan pembangunan tempat pemakaman umum di perkotaan tuban
topic analysis of cemetery needs
cemetery capacity
public cemetery
url https://ejournal2.undip.ac.id/index.php/tataloka/article/view/10341
work_keys_str_mv AT arwiyudhikoswara analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT ekobudisantoso analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT abdulafif analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT tetihariyati analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT sutiknosutikno analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT emaumilia analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT priantiprianti analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT rahelputripamungkas analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban
AT chichikilmiannisa analisiskebutuhanpembangunantempatpemakamanumumdiperkotaantuban