Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm
This research proposes a systematic model by using bee algorithm to optimize ready mixed concrete truck scheduling problem from a single plant to multiple sized receivers in a large search space using uncertain factors of bee algorithm compared to genetic algorithm. The objective is to minimize th...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Prince of Songkla University
2015-04-01
|
Series: | Songklanakarin Journal of Science and Technology (SJST) |
Subjects: | |
Online Access: | http://rdo.psu.ac.th/sjstweb/journal/37-2/37-2-13.pdf |
_version_ | 1819206814553604096 |
---|---|
author | Nuntana Mayteekrieangkrai Wuthichai Wongthatsanekorn |
author_facet | Nuntana Mayteekrieangkrai Wuthichai Wongthatsanekorn |
author_sort | Nuntana Mayteekrieangkrai |
collection | DOAJ |
description | This research proposes a systematic model by using bee algorithm to optimize ready mixed concrete truck scheduling
problem from a single plant to multiple sized receivers in a large search space using uncertain factors of bee algorithm
compared to genetic algorithm. The objective is to minimize the total waiting durations of RMC trucks. Four benchmark
problems with 3, 5, 9 and 12 construction sites are evaluated. Furthermore, eight additional problems are created from the
previous four problems by varying demands and traveling durations, in order to prove the algorithm accuracy and efficiency.
Hence, a total of 12 problems would be solved using both BA and GA. The simulation results show that the BA approach
can get lower total waiting durations and faster than GA for all problems. This research offers a more efficient alternative for
solving RMC truck scheduling. |
first_indexed | 2024-12-23T05:13:35Z |
format | Article |
id | doaj.art-4361725511344f6ea25e979528ed3ca8 |
institution | Directory Open Access Journal |
issn | 0125-3395 |
language | English |
last_indexed | 2024-12-23T05:13:35Z |
publishDate | 2015-04-01 |
publisher | Prince of Songkla University |
record_format | Article |
series | Songklanakarin Journal of Science and Technology (SJST) |
spelling | doaj.art-4361725511344f6ea25e979528ed3ca82022-12-21T17:58:54ZengPrince of Songkla UniversitySongklanakarin Journal of Science and Technology (SJST)0125-33952015-04-01372221230Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithmNuntana Mayteekrieangkrai0Wuthichai Wongthatsanekorn1Department of Industrial Engineering, Faculty of Engineering, Thammasat University, Khlong Luang, Pathum Thani, 12120 Thailand.Department of Industrial Engineering, Faculty of Engineering, Thammasat University, Khlong Luang, Pathum Thani, 12120 Thailand.This research proposes a systematic model by using bee algorithm to optimize ready mixed concrete truck scheduling problem from a single plant to multiple sized receivers in a large search space using uncertain factors of bee algorithm compared to genetic algorithm. The objective is to minimize the total waiting durations of RMC trucks. Four benchmark problems with 3, 5, 9 and 12 construction sites are evaluated. Furthermore, eight additional problems are created from the previous four problems by varying demands and traveling durations, in order to prove the algorithm accuracy and efficiency. Hence, a total of 12 problems would be solved using both BA and GA. The simulation results show that the BA approach can get lower total waiting durations and faster than GA for all problems. This research offers a more efficient alternative for solving RMC truck scheduling.http://rdo.psu.ac.th/sjstweb/journal/37-2/37-2-13.pdfbee algorithmgenetic algorithmready mixed concrete truck schedulinga large search spacean uncertain factors |
spellingShingle | Nuntana Mayteekrieangkrai Wuthichai Wongthatsanekorn Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm Songklanakarin Journal of Science and Technology (SJST) bee algorithm genetic algorithm ready mixed concrete truck scheduling a large search space an uncertain factors |
title | Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
title_full | Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
title_fullStr | Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
title_full_unstemmed | Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
title_short | Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
title_sort | optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm |
topic | bee algorithm genetic algorithm ready mixed concrete truck scheduling a large search space an uncertain factors |
url | http://rdo.psu.ac.th/sjstweb/journal/37-2/37-2-13.pdf |
work_keys_str_mv | AT nuntanamayteekrieangkrai optimizedreadymixedconcretetruckschedulingforuncertainfactorsusingbeealgorithm AT wuthichaiwongthatsanekorn optimizedreadymixedconcretetruckschedulingforuncertainfactorsusingbeealgorithm |