Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm
This research proposes a systematic model by using bee algorithm to optimize ready mixed concrete truck scheduling problem from a single plant to multiple sized receivers in a large search space using uncertain factors of bee algorithm compared to genetic algorithm. The objective is to minimize th...
Main Authors: | Nuntana Mayteekrieangkrai, Wuthichai Wongthatsanekorn |
---|---|
Format: | Article |
Language: | English |
Published: |
Prince of Songkla University
2015-04-01
|
Series: | Songklanakarin Journal of Science and Technology (SJST) |
Subjects: | |
Online Access: | http://rdo.psu.ac.th/sjstweb/journal/37-2/37-2-13.pdf |
Similar Items
-
Micro-Factors-Aware Scheduling of Multiple Autonomous Trucks in Open-Pit Mining via Enhanced Metaheuristics
by: Yong Fang, et al.
Published: (2023-09-01) -
A comparison of genetic algorithm and artificial bee colony approaches in solving blocking hybrid flowshop scheduling problem with sequence dependent setup/changeover times
by: Pongpan Nakkaew, et al.
Published: (2016-06-01) -
Research on the scheduling method of ground resource under uncertain arrival time
by: Guoning Xu, et al.
Published: (2023-12-01) -
Development of Heuristic Approaches for Last-Mile Delivery TSP with a Truck and Multiple Drones
by: Marco Rinaldi, et al.
Published: (2023-06-01) -
Integrated scheduling of distributed production and distribution in group manufacturing with uncertain travel time
by: Jun Guo, et al.
Published: (2022-10-01)