Correction: Five-Year Longitudinal Assessment of the Downstream Impact on Schistosomiasis Transmission following Closure of the Three Gorges Dam.
Main Authors: | Darren J. Gray, Aaron P. Thrift, Gail M. Williams, Feng Zheng, Yue-Sheng Li, Jiagang Guo, Honggen Chen, Tianping Wang, Xin Jiang Xu, Rong Zhu, Hongqing Zhu, Chun Li Cao, Dan Dan Lin, Zhen Yuan Zhao, Robert S. Li, George M. Davis, Donald P. McManus |
---|---|
Format: | Article |
Language: | English |
Published: |
Public Library of Science (PLoS)
2012-06-01
|
Series: | PLoS Neglected Tropical Diseases |
Online Access: | http://europepmc.org/articles/PMC3371066 |
Similar Items
-
Five-year longitudinal assessment of the downstream impact on schistosomiasis transmission following closure of the Three Gorges Dam.
by: Darren J Gray, et al.
Published: (2012-01-01) -
Correction: Five-Year Longitudinal Assessment of the Downstream Impact on Schistosomiasis Transmission following Closure of the Three Gorges Dam
Published: (2012-06-01) -
Influence of the Three Gorges Dam on schistosomiasis control in the middle and lower reaches of the Yangtze River
by: Shiqing Zhang, et al.
Published: (2019-03-01) -
Downstream Yangtze River levels impacted by Three Gorges Dam
by: Jida Wang, et al.
Published: (2013-01-01) -
Editorial: The impact of Three Gorges Dam on downstream river-lake system
by: Xijun Lai, et al.
Published: (2022-11-01)