Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progres...

Full description

Bibliographic Details
Main Authors: Akbar Alam-Tabriz, Farnoosh Khaledian, Mostafa Mahdipour
Format: Article
Language:fas
Published: Institute for Management & Planning Studies 2019-06-01
Series:فرایند مدیریت و توسعه
Subjects:
Online Access:http://jmdp.ir/article-1-2794-en.pdf
_version_ 1797450766032568320
author Akbar Alam-Tabriz
Farnoosh Khaledian
Mostafa Mahdipour
author_facet Akbar Alam-Tabriz
Farnoosh Khaledian
Mostafa Mahdipour
author_sort Akbar Alam-Tabriz
collection DOAJ
description Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the accepted rate of progress indexes of a project is not specified in this method, which brings about ambiguity. Intending to improve earned duration management performance, statistical quality control charts were used, which had previously been applied in Earned Value Management to determine the acceptable cut-off points of indexes of project management. Using Monte Carlo simulation, these charts were calculated at the time of project planning, but not during project implementation. Such calculations give project managers prospective view; in addition, they provide a basis for evaluating and comparing the performance of projects during their progress.
first_indexed 2024-03-09T14:44:22Z
format Article
id doaj.art-44dd1bb6482f45a79276c65d37a3ae10
institution Directory Open Access Journal
issn 1735-0719
2252-0074
language fas
last_indexed 2024-03-09T14:44:22Z
publishDate 2019-06-01
publisher Institute for Management & Planning Studies
record_format Article
series فرایند مدیریت و توسعه
spelling doaj.art-44dd1bb6482f45a79276c65d37a3ae102023-11-27T10:49:35ZfasInstitute for Management & Planning Studiesفرایند مدیریت و توسعه1735-07192252-00742019-06-01321325Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration ManagementAkbar Alam-Tabriz0Farnoosh Khaledian1Mostafa Mahdipour2 Shahid Beheshti University, Tehran, Iran. Islamic Azad University, Science and Research Branch, Tehran, Iran. Amirkabir University of Technology, Tehran, Iran. Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the accepted rate of progress indexes of a project is not specified in this method, which brings about ambiguity. Intending to improve earned duration management performance, statistical quality control charts were used, which had previously been applied in Earned Value Management to determine the acceptable cut-off points of indexes of project management. Using Monte Carlo simulation, these charts were calculated at the time of project planning, but not during project implementation. Such calculations give project managers prospective view; in addition, they provide a basis for evaluating and comparing the performance of projects during their progress.http://jmdp.ir/article-1-2794-en.pdfproject managementearned duration managementmonte carlo simulationstatistical quality controlcontrol limits.
spellingShingle Akbar Alam-Tabriz
Farnoosh Khaledian
Mostafa Mahdipour
Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
فرایند مدیریت و توسعه
project management
earned duration management
monte carlo simulation
statistical quality control
control limits.
title Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
title_full Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
title_fullStr Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
title_full_unstemmed Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
title_short Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
title_sort establishing control limits on time performance indicators of projects through monte carlo simulation and earned duration management
topic project management
earned duration management
monte carlo simulation
statistical quality control
control limits.
url http://jmdp.ir/article-1-2794-en.pdf
work_keys_str_mv AT akbaralamtabriz establishingcontrollimitsontimeperformanceindicatorsofprojectsthroughmontecarlosimulationandearneddurationmanagement
AT farnooshkhaledian establishingcontrollimitsontimeperformanceindicatorsofprojectsthroughmontecarlosimulationandearneddurationmanagement
AT mostafamahdipour establishingcontrollimitsontimeperformanceindicatorsofprojectsthroughmontecarlosimulationandearneddurationmanagement