The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways)
It is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recomme...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Gadjah Mada
2017-01-01
|
Series: | Journal of the Civil Engineering Forum |
Subjects: | |
Online Access: | https://jurnal.ugm.ac.id/jcef/article/view/26573 |
_version_ | 1819230033263198208 |
---|---|
author | Tetria Yunik Dewi Pamungkas Imam Muthohar |
author_facet | Tetria Yunik Dewi Pamungkas Imam Muthohar |
author_sort | Tetria Yunik Dewi Pamungkas |
collection | DOAJ |
description | It is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recommendations for management improvement of track maintenance by researching the track maintenance management system in Network Rail. This research study is based on secondary data. The analysis was conducted by using comparison method which compares the British Railways management and Indonesia railway management related to track maintenance management. The track maintenance management system was studied by using Network Rail. The results were compared with track maintenance management system in Indonesia. The comparison will provide the data differences that evaluated so the problem can be identified. The final result of this analysis was the identification of problems and improvisation that can be done for the development of track maintenance management in Indonesia. Several management issues have been mapped to several groups: finance management, structure organization, and asset management. From the problems that have been mapped, some improvements are recommended as monopolist authority restriction, maintenance system contract extension, re-structuring organization hierarchy, business plan consideration, track monitoring strategy arrangement, and condition based maintenance strategy adoption. |
first_indexed | 2024-12-23T11:22:38Z |
format | Article |
id | doaj.art-4512ecfada8845d2a592354af2d786fb |
institution | Directory Open Access Journal |
issn | 2089-5631 2549-5925 |
language | English |
last_indexed | 2024-12-23T11:22:38Z |
publishDate | 2017-01-01 |
publisher | Universitas Gadjah Mada |
record_format | Article |
series | Journal of the Civil Engineering Forum |
spelling | doaj.art-4512ecfada8845d2a592354af2d786fb2022-12-21T17:49:01ZengUniversitas Gadjah MadaJournal of the Civil Engineering Forum2089-56312549-59252017-01-0131516010.22146/jcef.2657317615The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways)Tetria Yunik Dewi Pamungkas0Imam Muthohar1Transportation Research GroupTransportation Laboratory, Universitas Gadjah MadaIt is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recommendations for management improvement of track maintenance by researching the track maintenance management system in Network Rail. This research study is based on secondary data. The analysis was conducted by using comparison method which compares the British Railways management and Indonesia railway management related to track maintenance management. The track maintenance management system was studied by using Network Rail. The results were compared with track maintenance management system in Indonesia. The comparison will provide the data differences that evaluated so the problem can be identified. The final result of this analysis was the identification of problems and improvisation that can be done for the development of track maintenance management in Indonesia. Several management issues have been mapped to several groups: finance management, structure organization, and asset management. From the problems that have been mapped, some improvements are recommended as monopolist authority restriction, maintenance system contract extension, re-structuring organization hierarchy, business plan consideration, track monitoring strategy arrangement, and condition based maintenance strategy adoption.https://jurnal.ugm.ac.id/jcef/article/view/26573Track maintenance management, asset management, British Railways, Network Rail, Indonesian railway |
spellingShingle | Tetria Yunik Dewi Pamungkas Imam Muthohar The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) Journal of the Civil Engineering Forum Track maintenance management, asset management, British Railways, Network Rail, Indonesian railway |
title | The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) |
title_full | The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) |
title_fullStr | The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) |
title_full_unstemmed | The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) |
title_short | The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways) |
title_sort | issues of track maintenance management in indonesia based on study of the british railways |
topic | Track maintenance management, asset management, British Railways, Network Rail, Indonesian railway |
url | https://jurnal.ugm.ac.id/jcef/article/view/26573 |
work_keys_str_mv | AT tetriayunikdewipamungkas theissuesoftrackmaintenancemanagementinindonesiabasedonstudyofthebritishrailways AT imammuthohar theissuesoftrackmaintenancemanagementinindonesiabasedonstudyofthebritishrailways AT tetriayunikdewipamungkas issuesoftrackmaintenancemanagementinindonesiabasedonstudyofthebritishrailways AT imammuthohar issuesoftrackmaintenancemanagementinindonesiabasedonstudyofthebritishrailways |