Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas

The highly temporal variability of the hydrological response in Mediterranean areas affects the operation of hydropower systems, especially in run-of-river (RoR) plants located in mountainous areas. Here, the water flow regime strongly determines failure, defined as no operating days due to inflows...

Full description

Bibliographic Details
Main Authors: Raquel Gómez-Beas, Eva Contreras, María José Polo, Cristina Aguilar
Format: Article
Language:English
Published: MDPI AG 2024-04-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/17/7/1705
_version_ 1797212625461837824
author Raquel Gómez-Beas
Eva Contreras
María José Polo
Cristina Aguilar
author_facet Raquel Gómez-Beas
Eva Contreras
María José Polo
Cristina Aguilar
author_sort Raquel Gómez-Beas
collection DOAJ
description The highly temporal variability of the hydrological response in Mediterranean areas affects the operation of hydropower systems, especially in run-of-river (RoR) plants located in mountainous areas. Here, the water flow regime strongly determines failure, defined as no operating days due to inflows below the minimum operating flow. A Bayesian dynamics stochastic model was developed with statistical modeling of both rainfall as the forcing agent and water inflows to the plants as the dependent variable using two approaches—parametric adjustments and non-parametric methods. Failure frequency analysis and its related operationality, along with their uncertainty associated with different time scales, were performed through 250 Monte Carlo stochastic replications of a 20-year period of daily rainfall. Finally, a scenario analysis was performed, including the effects of 3 and 30 days of water storage in a plant loading chamber to minimize the plant’s dependence on the river’s flow. The approach was applied to a mini-hydropower RoR plant in Poqueira (Southern Spain), located in a semi-arid Mediterranean alpine area. The results reveal that the influence of snow had greater operationality in the spring months when snowmelt was outstanding, with a 25% probability of having fewer than 2 days of failure in May and April, as opposed to 12 days in the winter months. Moreover, the effect of water storage was greater between June and November, when rainfall events are scarce, and snowmelt has almost finished with operationality levels of 0.04–0.74 for 15 days of failure without storage, which increased to 0.1–0.87 with 3 days of storage. The methodology proposed constitutes a simple and useful tool to assess uncertainty in the operationality of RoR plants in Mediterranean mountainous areas where rainfall constitutes the main source of uncertainty in river flows.
first_indexed 2024-04-24T10:45:22Z
format Article
id doaj.art-460a0654a744424fb364d029a0da8079
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-04-24T10:45:22Z
publishDate 2024-04-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-460a0654a744424fb364d029a0da80792024-04-12T13:18:08ZengMDPI AGEnergies1996-10732024-04-01177170510.3390/en17071705Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain AreasRaquel Gómez-Beas0Eva Contreras1María José Polo2Cristina Aguilar3Fluvial Dynamics and Hydrology Research Group, Andalusian Institute for Earth System Research, University of Cordoba, 14071 Cordoba, SpainFluvial Dynamics and Hydrology Research Group, Andalusian Institute for Earth System Research, University of Cordoba, 14071 Cordoba, SpainFluvial Dynamics and Hydrology Research Group, Andalusian Institute for Earth System Research, University of Cordoba, 14071 Cordoba, SpainFluvial Dynamics and Hydrology Research Group, Andalusian Institute for Earth System Research, University of Cordoba, 14071 Cordoba, SpainThe highly temporal variability of the hydrological response in Mediterranean areas affects the operation of hydropower systems, especially in run-of-river (RoR) plants located in mountainous areas. Here, the water flow regime strongly determines failure, defined as no operating days due to inflows below the minimum operating flow. A Bayesian dynamics stochastic model was developed with statistical modeling of both rainfall as the forcing agent and water inflows to the plants as the dependent variable using two approaches—parametric adjustments and non-parametric methods. Failure frequency analysis and its related operationality, along with their uncertainty associated with different time scales, were performed through 250 Monte Carlo stochastic replications of a 20-year period of daily rainfall. Finally, a scenario analysis was performed, including the effects of 3 and 30 days of water storage in a plant loading chamber to minimize the plant’s dependence on the river’s flow. The approach was applied to a mini-hydropower RoR plant in Poqueira (Southern Spain), located in a semi-arid Mediterranean alpine area. The results reveal that the influence of snow had greater operationality in the spring months when snowmelt was outstanding, with a 25% probability of having fewer than 2 days of failure in May and April, as opposed to 12 days in the winter months. Moreover, the effect of water storage was greater between June and November, when rainfall events are scarce, and snowmelt has almost finished with operationality levels of 0.04–0.74 for 15 days of failure without storage, which increased to 0.1–0.87 with 3 days of storage. The methodology proposed constitutes a simple and useful tool to assess uncertainty in the operationality of RoR plants in Mediterranean mountainous areas where rainfall constitutes the main source of uncertainty in river flows.https://www.mdpi.com/1996-1073/17/7/1705Run-of-River (RoR) hydropower plantriver flowenergy productionoperationalityfailureuncertainty
spellingShingle Raquel Gómez-Beas
Eva Contreras
María José Polo
Cristina Aguilar
Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
Energies
Run-of-River (RoR) hydropower plant
river flow
energy production
operationality
failure
uncertainty
title Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
title_full Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
title_fullStr Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
title_full_unstemmed Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
title_short Stochastic Flow Analysis for Optimization of the Operationality in Run-of-River Hydroelectric Plants in Mountain Areas
title_sort stochastic flow analysis for optimization of the operationality in run of river hydroelectric plants in mountain areas
topic Run-of-River (RoR) hydropower plant
river flow
energy production
operationality
failure
uncertainty
url https://www.mdpi.com/1996-1073/17/7/1705
work_keys_str_mv AT raquelgomezbeas stochasticflowanalysisforoptimizationoftheoperationalityinrunofriverhydroelectricplantsinmountainareas
AT evacontreras stochasticflowanalysisforoptimizationoftheoperationalityinrunofriverhydroelectricplantsinmountainareas
AT mariajosepolo stochasticflowanalysisforoptimizationoftheoperationalityinrunofriverhydroelectricplantsinmountainareas
AT cristinaaguilar stochasticflowanalysisforoptimizationoftheoperationalityinrunofriverhydroelectricplantsinmountainareas