Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources s...
| Main Author: | Kadhim Raheem, Instructor |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
University of Baghdad
2015-02-01
|
| Series: | Journal of Engineering |
| Subjects: | |
| Online Access: | http://joe.uobaghdad.edu.iq/index.php/main/article/view/464 |
Similar Items
-
Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
by: Kadhim Raheem
Published: (2015-02-01) -
Comparison of the Performance of “Unit Area Cost Method” (UACM) and “Unit Price Method” (UPM) Used in Estimating the Costs of the Reinforced Concrete Multi-Storey Housing Buildings
by: Latif Onur Uğur, et al.
Published: (2021-06-01) -
A review of the effects on IRT item parameter estimates with a focus on misbehaving common items in test equating
by: Michalis P Michaelides
Published: (2010-10-01) -
Study of Commitment Items Quality Members Effect on Price Synchronism in Tehran Stock Exchange
by: Morteza Doosti Seyyed Shekari, et al.
Published: (2017-06-01) -
Pricing and inventory control policy for non-instantaneous deteriorating items with time- and price-dependent demand and partial backlogging
by: Hiwa Farughi, et al.
Published: (2014-06-01)