Solving Energy-Aware Real-Time Tasks Scheduling Problem with Shuffled Frog Leaping Algorithm on Heterogeneous Platforms
Reducing energy consumption is becoming very important in order to keep battery life and lower overall operational costs for heterogeneous real-time multiprocessor systems. In this paper, we first formulate this as a combinatorial optimization problem. Then, a successful meta-heuristic, called Shu...
Main Authors: | Weizhe Zhang, Enci Bai, Hui He, Albert M.K. Cheng |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2015-06-01
|
Series: | Sensors |
Subjects: | |
Online Access: | http://www.mdpi.com/1424-8220/15/6/13778 |
Similar Items
-
Shuffled Frog-Leaping Programming for Solving Regression Problems
by: M. Abdollahi, et al.
Published: (2020-07-01) -
An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem
by: Kong Lu, et al.
Published: (2015-02-01) -
A Shuffled Frog-Leaping Algorithm with Cooperations for Distributed Assembly Hybrid-Flow Shop Scheduling with Factory Eligibility
by: Deming Lei, et al.
Published: (2023-03-01) -
Mathematical modelling of bio-inspired frog leap optimization algorithm for transmission expansion planning
by: Smita Shandilya, et al.
Published: (2022-05-01) -
An Improved Shuffled Frog-Leaping Algorithm for Solving the Dynamic and Continuous Berth Allocation Problem (DCBAP)
by: Hsien-Pin Hsu, et al.
Published: (2019-11-01)