Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road
Toll roads have an important role on the economic development, therefore it is necessary to make road improvements to increase the road serviceability or minimum service standards (standar pelayanan minimal / SPM), as described in the Indonesian Government Regulation No. 34 of 2006 on roads. The C...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Institut Teknologi Bandung
2019-04-01
|
Series: | Jurnal Teknik Sipil |
Subjects: | |
Online Access: | http://journals.itb.ac.id/index.php/jts/article/view/11187/4180 |
_version_ | 1811249300655570944 |
---|---|
author | Yansen Stevenson Lau Bambang Sugeng Subagio Sri Hendarto |
author_facet | Yansen Stevenson Lau Bambang Sugeng Subagio Sri Hendarto |
author_sort | Yansen Stevenson Lau |
collection | DOAJ |
description | Toll roads have an important role on the economic development, therefore it is necessary to make road
improvements to increase the road serviceability or minimum service standards (standar pelayanan minimal /
SPM), as described in the Indonesian Government Regulation No. 34 of 2006 on roads. The CIPALI toll road has operated since 2015 and it connects Cikampek and Palimanan. Therefore, it is important to carry out a structural maintenance, in this case is by adding an overlay so that the pavement structure remains stable in supporting the repetition load which always increases over time. This study aims to analyze the overlay thickness using the AUSTROAD 2010 mechanistic procedure with the help of the CIRCLY and KENPAVE program, with a study area on the CIPALI toll road between kilometer 110 + 000 to kilometer 115 + 000. Referring to the results of the analysis, the overlay thickness calculated using the CIRCLY program requires a minimum thickness of 170 mm for the 2-layer model and 3-layer model in the direction towards Subang, and 160 mm for the 2-layer model and 150 mm for the 3-layer model in the direction toward Palimanan. The overlay thickness needed with an analysis using the linear-elastic KENLAYER program in the direction towards Palimanan is 140 mm for the 2-layer model and 100 mm for the 3-layer model, while the thickness of the overlay in the direction towards Subang is 160 mm for the 2-layer model and 130 mm for the 3-layer model. The overlay thickness needed with an analysis using the nonlinear KENLAYER program in the direction towards is 120 mm for the 2-layer model and 80 mm for the 3-layer model, and for the direction toward Subang is 140 mm for the 2-layer model and 100 mm for the 3-layer model. |
first_indexed | 2024-04-12T15:44:04Z |
format | Article |
id | doaj.art-4811cfe9a3c246b1a1222ac295f59ec4 |
institution | Directory Open Access Journal |
issn | 0853-2982 2549-2659 |
language | English |
last_indexed | 2024-04-12T15:44:04Z |
publishDate | 2019-04-01 |
publisher | Institut Teknologi Bandung |
record_format | Article |
series | Jurnal Teknik Sipil |
spelling | doaj.art-4811cfe9a3c246b1a1222ac295f59ec42022-12-22T03:26:42ZengInstitut Teknologi BandungJurnal Teknik Sipil0853-29822549-26592019-04-01263172410.5614/jts.2019.26.1.3Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll RoadYansen Stevenson Lau0Bambang Sugeng Subagio1Sri Hendarto2Institut Teknologi BandungInstitut Teknologi BandungInstitut Teknologi BandungToll roads have an important role on the economic development, therefore it is necessary to make road improvements to increase the road serviceability or minimum service standards (standar pelayanan minimal / SPM), as described in the Indonesian Government Regulation No. 34 of 2006 on roads. The CIPALI toll road has operated since 2015 and it connects Cikampek and Palimanan. Therefore, it is important to carry out a structural maintenance, in this case is by adding an overlay so that the pavement structure remains stable in supporting the repetition load which always increases over time. This study aims to analyze the overlay thickness using the AUSTROAD 2010 mechanistic procedure with the help of the CIRCLY and KENPAVE program, with a study area on the CIPALI toll road between kilometer 110 + 000 to kilometer 115 + 000. Referring to the results of the analysis, the overlay thickness calculated using the CIRCLY program requires a minimum thickness of 170 mm for the 2-layer model and 3-layer model in the direction towards Subang, and 160 mm for the 2-layer model and 150 mm for the 3-layer model in the direction toward Palimanan. The overlay thickness needed with an analysis using the linear-elastic KENLAYER program in the direction towards Palimanan is 140 mm for the 2-layer model and 100 mm for the 3-layer model, while the thickness of the overlay in the direction towards Subang is 160 mm for the 2-layer model and 130 mm for the 3-layer model. The overlay thickness needed with an analysis using the nonlinear KENLAYER program in the direction towards is 120 mm for the 2-layer model and 80 mm for the 3-layer model, and for the direction toward Subang is 140 mm for the 2-layer model and 100 mm for the 3-layer model.http://journals.itb.ac.id/index.php/jts/article/view/11187/4180flexible pavementaustroad 2010kenlayercirclyoverlay thickness |
spellingShingle | Yansen Stevenson Lau Bambang Sugeng Subagio Sri Hendarto Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road Jurnal Teknik Sipil flexible pavement austroad 2010 kenlayer circly overlay thickness |
title | Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road |
title_full | Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road |
title_fullStr | Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road |
title_full_unstemmed | Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road |
title_short | Overlay Thickness of Flexible Pavement Analysis Using the Austroad 2010 Method and the Kenpave Program Case Study: CIPALI (Cikopo - Palimanan) Toll Road |
title_sort | overlay thickness of flexible pavement analysis using the austroad 2010 method and the kenpave program case study cipali cikopo palimanan toll road |
topic | flexible pavement austroad 2010 kenlayer circly overlay thickness |
url | http://journals.itb.ac.id/index.php/jts/article/view/11187/4180 |
work_keys_str_mv | AT yansenstevensonlau overlaythicknessofflexiblepavementanalysisusingtheaustroad2010methodandthekenpaveprogramcasestudycipalicikopopalimanantollroad AT bambangsugengsubagio overlaythicknessofflexiblepavementanalysisusingtheaustroad2010methodandthekenpaveprogramcasestudycipalicikopopalimanantollroad AT srihendarto overlaythicknessofflexiblepavementanalysisusingtheaustroad2010methodandthekenpaveprogramcasestudycipalicikopopalimanantollroad |