Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction

Along with Indonesia's economy and population growth, the community's need for building construction and infrastructure will also increase. Project implementation is undoubtedly expected to meet the predetermined quality, time, and cost targets, so a good project management system is neede...

Full description

Bibliographic Details
Main Authors: Muhammad Faizal Ardhiansyah Arifin, Maulidiya Sarifatuzzuhriyah, Shu Sun Liu
Format: Article
Language:English
Published: Universitas Negeri Semarang 2023-04-01
Series:Jurnal Teknik Sipil dan Perencanaan
Subjects:
Online Access:https://journal.unnes.ac.id/nju/jtsp/article/view/43043
_version_ 1797272009880633344
author Muhammad Faizal Ardhiansyah Arifin
Maulidiya Sarifatuzzuhriyah
Shu Sun Liu
author_facet Muhammad Faizal Ardhiansyah Arifin
Maulidiya Sarifatuzzuhriyah
Shu Sun Liu
author_sort Muhammad Faizal Ardhiansyah Arifin
collection DOAJ
description Along with Indonesia's economy and population growth, the community's need for building construction and infrastructure will also increase. Project implementation is undoubtedly expected to meet the predetermined quality, time, and cost targets, so a good project management system is needed. However, there is often a mismatch between planning time and realization due to obstacles during project performance, causing delays and over-budget on the project completion. Therefore, it is necessary to monitor the cost and time carried out in an integrated manner to estimate the total cost and time needed until the project is completed. This monitoring is used to avoid delays and cost overruns, which can be done using the Earned Value Analysis Method. This research is expected to monitor and control the time and cost required to implement the MRT-Hub Building Construction Project of Dukuh Atas Intersection to avoid losses or delays when the project is completed. The results of the analysis, based on the Earned Value Analysis Method at week 57th after the addendum, the result of the Schedule Variance (SV) is negative. In contrast, the Cost Variance (CV) is positive (+). The result of the Schedule Performance Index (SPI) is smaller than 1, while the Cost Performance Index (CPI) is greater than 1 ( 1). Thus, it is known that the project performance is running slower than the planned schedule, and the actual cost is smaller than the budget performed. Based on these results, the estimated temporary schedule (ETS) at week 57th is 188.3538 days with a remaining cost (ETC) of IDR 97,526,302,702.70. Meanwhile, the estimated project completion time (EAS) is 584.3538 days with an estimated all-cost (EAC) of IDR 171,868,372,084.14. Thus, it can be concluded that the project is expected to be -0.0606% later than the addendum schedule, with an estimated project profit of 10.0123% of the addendum budget.
first_indexed 2024-03-07T14:20:18Z
format Article
id doaj.art-48d1afdad2fa4488849c4dd3e41f4b53
institution Directory Open Access Journal
issn 1411-1772
2503-1899
language English
last_indexed 2024-03-07T14:20:18Z
publishDate 2023-04-01
publisher Universitas Negeri Semarang
record_format Article
series Jurnal Teknik Sipil dan Perencanaan
spelling doaj.art-48d1afdad2fa4488849c4dd3e41f4b532024-03-06T09:28:04ZengUniversitas Negeri SemarangJurnal Teknik Sipil dan Perencanaan1411-17722503-18992023-04-01251909910.15294/jtsp.v25i1.4304313780Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building ConstructionMuhammad Faizal Ardhiansyah Arifin0Maulidiya Sarifatuzzuhriyah1Shu Sun Liu2Universitas Negeri SemarangUniversitas Negeri SemarangNational Yunlin University of Science and TechnologyAlong with Indonesia's economy and population growth, the community's need for building construction and infrastructure will also increase. Project implementation is undoubtedly expected to meet the predetermined quality, time, and cost targets, so a good project management system is needed. However, there is often a mismatch between planning time and realization due to obstacles during project performance, causing delays and over-budget on the project completion. Therefore, it is necessary to monitor the cost and time carried out in an integrated manner to estimate the total cost and time needed until the project is completed. This monitoring is used to avoid delays and cost overruns, which can be done using the Earned Value Analysis Method. This research is expected to monitor and control the time and cost required to implement the MRT-Hub Building Construction Project of Dukuh Atas Intersection to avoid losses or delays when the project is completed. The results of the analysis, based on the Earned Value Analysis Method at week 57th after the addendum, the result of the Schedule Variance (SV) is negative. In contrast, the Cost Variance (CV) is positive (+). The result of the Schedule Performance Index (SPI) is smaller than 1, while the Cost Performance Index (CPI) is greater than 1 ( 1). Thus, it is known that the project performance is running slower than the planned schedule, and the actual cost is smaller than the budget performed. Based on these results, the estimated temporary schedule (ETS) at week 57th is 188.3538 days with a remaining cost (ETC) of IDR 97,526,302,702.70. Meanwhile, the estimated project completion time (EAS) is 584.3538 days with an estimated all-cost (EAC) of IDR 171,868,372,084.14. Thus, it can be concluded that the project is expected to be -0.0606% later than the addendum schedule, with an estimated project profit of 10.0123% of the addendum budget.https://journal.unnes.ac.id/nju/jtsp/article/view/43043earned value method, project controlling, time schedule
spellingShingle Muhammad Faizal Ardhiansyah Arifin
Maulidiya Sarifatuzzuhriyah
Shu Sun Liu
Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
Jurnal Teknik Sipil dan Perencanaan
earned value method, project controlling, time schedule
title Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
title_full Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
title_fullStr Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
title_full_unstemmed Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
title_short Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction
title_sort cost and time control analysis with earned value method in the mrt hub building construction
topic earned value method, project controlling, time schedule
url https://journal.unnes.ac.id/nju/jtsp/article/view/43043
work_keys_str_mv AT muhammadfaizalardhiansyaharifin costandtimecontrolanalysiswithearnedvaluemethodinthemrthubbuildingconstruction
AT maulidiyasarifatuzzuhriyah costandtimecontrolanalysiswithearnedvaluemethodinthemrthubbuildingconstruction
AT shusunliu costandtimecontrolanalysiswithearnedvaluemethodinthemrthubbuildingconstruction