Reliability Distribution System on Load Break Switch Addition at PT. PLN (PERSERO) ULP Langsa City Using RIA-SECTION Technique Combined Method on ETAP 14.1.0
PT. PLN (Persero) ULP Langsa city is one part of UP 3 langsa, the LS-05 feeder in section two is the location for placing several office buildings. Continuity stable distribution of electrical energy is one of the most important aspects in the distribution system. Based on these problems, the writer...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Lembaga Penelitian dan Pengabdian Masyarakat (LPPM), Universitas Andalas
2022-07-01
|
Series: | Andalasian International Journal of Applied Science, Engineering, and Technology |
Online Access: | https://aijaset.lppm.unand.ac.id/index.php/aijaset/article/view/42 |