Methods for Modeling and Evaluating Construction Disputes: A Critical Review

Cost and time are the targeted outcomes of any successful construction project, and disputes over these two key factors constitute a major obstacle to successful project outcomes. As escalated levels of dispute are becoming increasingly unavoidable, the construction industry is aiming to develop dis...

Full description

Bibliographic Details
Main Authors: Khalid K. Naji, Manal M. Mansour, Murat Gunduz
Format: Article
Language:English
Published: IEEE 2020-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9007665/
_version_ 1811209768822374400
author Khalid K. Naji
Manal M. Mansour
Murat Gunduz
author_facet Khalid K. Naji
Manal M. Mansour
Murat Gunduz
author_sort Khalid K. Naji
collection DOAJ
description Cost and time are the targeted outcomes of any successful construction project, and disputes over these two key factors constitute a major obstacle to successful project outcomes. As escalated levels of dispute are becoming increasingly unavoidable, the construction industry is aiming to develop dispute identification strategies to reduce and eliminate them during construction. However, existing research on construction disputes appears to give more consideration to dispute resolution than it does to avoiding conflict and preventing disputes from arising in the first place. This paper aims to minimize disputes during construction by addressing the causes of disputes during the pre-construction phase. As an integral part of ongoing research, it presents the results of a thorough study encompassing a critical review of previous research on construction disputes. Several conflicts and disputes are categorized and analyzed to allow for the future determination of their direct and/or indirect links to the pre-construction phase. This review also elaborates on the different methods of research adopted in the literature and the relevant research tools utilized. The research highlights the use of fuzzy logic coupled with structural equation modeling (SEM) as a recognized and valid modeling tool in construction projects, as it models and establishes an appropriate framework for dispute modeling and evaluation. The findings of this review therefore call for a further investigation of and deep research into the relationship between the characteristics of the pre-construction phase and the types of disputes and their likelihood of taking place during the construction phase itself. These findings can be utilized to develop an operational framework for predicting dispute occurrences during construction. The paper concludes by providing a developed hybrid fuzzy-SEM model to quantify the probability of dispute occurrence in construction projects, thereby enabling project stakeholders to predict, identify, and properly manage dispute occurrences during the pre-construction phase.
first_indexed 2024-04-12T04:45:41Z
format Article
id doaj.art-4a37b04399804d7b9da506763f1ff774
institution Directory Open Access Journal
issn 2169-3536
language English
last_indexed 2024-04-12T04:45:41Z
publishDate 2020-01-01
publisher IEEE
record_format Article
series IEEE Access
spelling doaj.art-4a37b04399804d7b9da506763f1ff7742022-12-22T03:47:31ZengIEEEIEEE Access2169-35362020-01-018456414565210.1109/ACCESS.2020.29761099007665Methods for Modeling and Evaluating Construction Disputes: A Critical ReviewKhalid K. Naji0https://orcid.org/0000-0003-2050-3126Manal M. Mansour1https://orcid.org/0000-0002-3148-2810Murat Gunduz2https://orcid.org/0000-0003-2602-3318College of Engineering, Qatar University, Doha, QatarEngineering Management Program, Qatar University, Doha, QatarDepartment of Civil and Architectural Engineering, Qatar University, Doha, QatarCost and time are the targeted outcomes of any successful construction project, and disputes over these two key factors constitute a major obstacle to successful project outcomes. As escalated levels of dispute are becoming increasingly unavoidable, the construction industry is aiming to develop dispute identification strategies to reduce and eliminate them during construction. However, existing research on construction disputes appears to give more consideration to dispute resolution than it does to avoiding conflict and preventing disputes from arising in the first place. This paper aims to minimize disputes during construction by addressing the causes of disputes during the pre-construction phase. As an integral part of ongoing research, it presents the results of a thorough study encompassing a critical review of previous research on construction disputes. Several conflicts and disputes are categorized and analyzed to allow for the future determination of their direct and/or indirect links to the pre-construction phase. This review also elaborates on the different methods of research adopted in the literature and the relevant research tools utilized. The research highlights the use of fuzzy logic coupled with structural equation modeling (SEM) as a recognized and valid modeling tool in construction projects, as it models and establishes an appropriate framework for dispute modeling and evaluation. The findings of this review therefore call for a further investigation of and deep research into the relationship between the characteristics of the pre-construction phase and the types of disputes and their likelihood of taking place during the construction phase itself. These findings can be utilized to develop an operational framework for predicting dispute occurrences during construction. The paper concludes by providing a developed hybrid fuzzy-SEM model to quantify the probability of dispute occurrence in construction projects, thereby enabling project stakeholders to predict, identify, and properly manage dispute occurrences during the pre-construction phase.https://ieeexplore.ieee.org/document/9007665/Disputeconstruction projectspre-construction phasefuzzy logicstructural equation model (SEM)dispute resolution
spellingShingle Khalid K. Naji
Manal M. Mansour
Murat Gunduz
Methods for Modeling and Evaluating Construction Disputes: A Critical Review
IEEE Access
Dispute
construction projects
pre-construction phase
fuzzy logic
structural equation model (SEM)
dispute resolution
title Methods for Modeling and Evaluating Construction Disputes: A Critical Review
title_full Methods for Modeling and Evaluating Construction Disputes: A Critical Review
title_fullStr Methods for Modeling and Evaluating Construction Disputes: A Critical Review
title_full_unstemmed Methods for Modeling and Evaluating Construction Disputes: A Critical Review
title_short Methods for Modeling and Evaluating Construction Disputes: A Critical Review
title_sort methods for modeling and evaluating construction disputes a critical review
topic Dispute
construction projects
pre-construction phase
fuzzy logic
structural equation model (SEM)
dispute resolution
url https://ieeexplore.ieee.org/document/9007665/
work_keys_str_mv AT khalidknaji methodsformodelingandevaluatingconstructiondisputesacriticalreview
AT manalmmansour methodsformodelingandevaluatingconstructiondisputesacriticalreview
AT muratgunduz methodsformodelingandevaluatingconstructiondisputesacriticalreview