Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction

The construction of an individual project or a complex is characterized by a number of interrelated factors, which are determined by the technological, volumetric and design characteristics of the construction process, as well as by planning, financial, organizational and technical conditions. The...

Full description

Bibliographic Details
Main Authors: Petr Grigor'evich Grabovyy, Denis Evgenievich Sezemin
Format: Article
Language:English
Published: Publishing House ASV 2024-03-01
Series:Недвижимость: экономика, управление
Subjects:
Online Access:https://n-eu.iasv.ru/index.php/neu/article/view/182
_version_ 1797229372515549184
author Petr Grigor'evich Grabovyy
Denis Evgenievich Sezemin
author_facet Petr Grigor'evich Grabovyy
Denis Evgenievich Sezemin
author_sort Petr Grigor'evich Grabovyy
collection DOAJ
description The construction of an individual project or a complex is characterized by a number of interrelated factors, which are determined by the technological, volumetric and design characteristics of the construction process, as well as by planning, financial, organizational and technical conditions. The optimal construction of objects and complexes is based on the organization of all processes in optimal terms, taking into account perfect technology and mechanization with a rational combination of construction, installation and commissioning works, ensuring minimum cost of construction. The optimal variant of construction of nuclear power facilities is selected by comparing a number of variants that differ in the means of mechanization and technology used for certain types of works, duration of construction and assembly works, start and end dates of works, method of construction of facilities, technological sequence of works, degree of combination of construction and assembly and commissioning works, and applied methods of works production. The experience of design and construction of start-up complexes shows that in the construction of industrial facilities, on-site preparatory and main construction and installation works are performed sequentially. According to the requirements of the norms for the preparatory works, the capital investments are mainly planned to be distributed evenly, which is irrational, as it leads to a decrease in their efficiency and delays the construction period. In the course of preparatory works at the site, the character of the distribution of capital investments by time periods can be different. As the practice of NPP construction shows, in case of combined sequential execution of preparatory and main construction and installation works at the site, the following options are possible: 1) less intensive accumulation of volumes at the beginning of the preparation; 2) equal distribution of capital investments over the whole preparation (if preparatory and main works are performed sequentially); 3) accelerated accumulation in the middle part and deceleration of this process at the end of the preparation, or more intensive accumulation of volumes at the beginning and deceleration of this process in the middle and at the end of the preparation (if preparatory and main works are combined). When considering the possible combinations of preparatory and main construction and installation works, it is necessary to take into account the reduction of the total construction period of the nuclear power complex both due to the combination of the preparatory works among themselves and due to their combination with the main works.
first_indexed 2024-04-24T15:11:33Z
format Article
id doaj.art-4a52ebbe194647aea7d6faf208758947
institution Directory Open Access Journal
issn 2073-8412
3034-1485
language English
last_indexed 2024-04-24T15:11:33Z
publishDate 2024-03-01
publisher Publishing House ASV
record_format Article
series Недвижимость: экономика, управление
spelling doaj.art-4a52ebbe194647aea7d6faf2087589472024-04-02T10:38:07ZengPublishing House ASVНедвижимость: экономика, управление2073-84123034-14852024-03-01110.22337/2073-8412-2024-1-55-62Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction Petr Grigor'evich Grabovyy0Denis Evgenievich Sezemin1Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU); Akkuyu Nükleer Anonim SirketiThe construction of an individual project or a complex is characterized by a number of interrelated factors, which are determined by the technological, volumetric and design characteristics of the construction process, as well as by planning, financial, organizational and technical conditions. The optimal construction of objects and complexes is based on the organization of all processes in optimal terms, taking into account perfect technology and mechanization with a rational combination of construction, installation and commissioning works, ensuring minimum cost of construction. The optimal variant of construction of nuclear power facilities is selected by comparing a number of variants that differ in the means of mechanization and technology used for certain types of works, duration of construction and assembly works, start and end dates of works, method of construction of facilities, technological sequence of works, degree of combination of construction and assembly and commissioning works, and applied methods of works production. The experience of design and construction of start-up complexes shows that in the construction of industrial facilities, on-site preparatory and main construction and installation works are performed sequentially. According to the requirements of the norms for the preparatory works, the capital investments are mainly planned to be distributed evenly, which is irrational, as it leads to a decrease in their efficiency and delays the construction period. In the course of preparatory works at the site, the character of the distribution of capital investments by time periods can be different. As the practice of NPP construction shows, in case of combined sequential execution of preparatory and main construction and installation works at the site, the following options are possible: 1) less intensive accumulation of volumes at the beginning of the preparation; 2) equal distribution of capital investments over the whole preparation (if preparatory and main works are performed sequentially); 3) accelerated accumulation in the middle part and deceleration of this process at the end of the preparation, or more intensive accumulation of volumes at the beginning and deceleration of this process in the middle and at the end of the preparation (if preparatory and main works are combined). When considering the possible combinations of preparatory and main construction and installation works, it is necessary to take into account the reduction of the total construction period of the nuclear power complex both due to the combination of the preparatory works among themselves and due to their combination with the main works. https://n-eu.iasv.ru/index.php/neu/article/view/182NPP–1200 construction flowson-site preparatory workscritical pathpreference rulesinstallation methodsdifferent options of construction organization
spellingShingle Petr Grigor'evich Grabovyy
Denis Evgenievich Sezemin
Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
Недвижимость: экономика, управление
NPP–1200 construction flows
on-site preparatory works
critical path
preference rules
installation methods
different options of construction organization
title Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
title_full Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
title_fullStr Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
title_full_unstemmed Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
title_short Implementation of NPP–1200 Nuclear Megaprojects Abroad Using Preferential Rules of Flow Construction
title_sort implementation of npp 1200 nuclear megaprojects abroad using preferential rules of flow construction
topic NPP–1200 construction flows
on-site preparatory works
critical path
preference rules
installation methods
different options of construction organization
url https://n-eu.iasv.ru/index.php/neu/article/view/182
work_keys_str_mv AT petrgrigorevichgrabovyy implementationofnpp1200nuclearmegaprojectsabroadusingpreferentialrulesofflowconstruction
AT denisevgenievichsezemin implementationofnpp1200nuclearmegaprojectsabroadusingpreferentialrulesofflowconstruction