Mathematical modeling of technological operations performed by trains at stations

The main purpose of the work is mathematical modeling of the sequence of technological operations performed by trains at stations. Methods of systematic analysis, analytical, regression and graphic modeling, flow mapping of the sequence of technological actions were used. The methods of normalizing...

Full description

Bibliographic Details
Main Authors: Butunov Dilmurod, Kalimbetova Zhansaya, Abdukodirov Sardor, Buriyev Shuhrat, Tuxtaxodjayeva Mafiratxon
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/97/e3sconf_bft2023_06002.pdf
_version_ 1797345145455116288
author Butunov Dilmurod
Kalimbetova Zhansaya
Abdukodirov Sardor
Buriyev Shuhrat
Tuxtaxodjayeva Mafiratxon
author_facet Butunov Dilmurod
Kalimbetova Zhansaya
Abdukodirov Sardor
Buriyev Shuhrat
Tuxtaxodjayeva Mafiratxon
author_sort Butunov Dilmurod
collection DOAJ
description The main purpose of the work is mathematical modeling of the sequence of technological operations performed by trains at stations. Methods of systematic analysis, analytical, regression and graphic modeling, flow mapping of the sequence of technological actions were used. The methods of normalizing the time of stay of trains at stations and their advantages, the degree of interconnections and disadvantages of technological actions were studied. At the station, the time spent on the technological actions performed with the train was analyzed and the factors that negatively affect their execution were determined. In order to increase the level of execution of station performance indicators, it was recommended that the method of basic normalization of the time for performing technological actions with shunting and train locomotives depends on the length of the half-trip, the number of connecting and disconnecting wagons and the speed of the shunting. This method allows you to analyze the indicators of the time spent on technological actions at stations and the graph of train traffic (GTT), as well as increase the carrying capacity of rail transport by 7-11%.
first_indexed 2024-03-08T11:13:18Z
format Article
id doaj.art-4c6fad32cfa74598a086d85be8ea9a2e
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-08T11:13:18Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-4c6fad32cfa74598a086d85be8ea9a2e2024-01-26T10:39:30ZengEDP SciencesE3S Web of Conferences2267-12422023-01-014600600210.1051/e3sconf/202346006002e3sconf_bft2023_06002Mathematical modeling of technological operations performed by trains at stationsButunov Dilmurod0Kalimbetova Zhansaya1Abdukodirov Sardor2Buriyev Shuhrat3Tuxtaxodjayeva Mafiratxon4Tashkent State Transport UniversityKhoja Akhmet Yassawi International Kazakh–Turkish UniversityTashkent State Transport UniversityTashkent State Transport UniversityTashkent State Transport UniversityThe main purpose of the work is mathematical modeling of the sequence of technological operations performed by trains at stations. Methods of systematic analysis, analytical, regression and graphic modeling, flow mapping of the sequence of technological actions were used. The methods of normalizing the time of stay of trains at stations and their advantages, the degree of interconnections and disadvantages of technological actions were studied. At the station, the time spent on the technological actions performed with the train was analyzed and the factors that negatively affect their execution were determined. In order to increase the level of execution of station performance indicators, it was recommended that the method of basic normalization of the time for performing technological actions with shunting and train locomotives depends on the length of the half-trip, the number of connecting and disconnecting wagons and the speed of the shunting. This method allows you to analyze the indicators of the time spent on technological actions at stations and the graph of train traffic (GTT), as well as increase the carrying capacity of rail transport by 7-11%.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/97/e3sconf_bft2023_06002.pdf
spellingShingle Butunov Dilmurod
Kalimbetova Zhansaya
Abdukodirov Sardor
Buriyev Shuhrat
Tuxtaxodjayeva Mafiratxon
Mathematical modeling of technological operations performed by trains at stations
E3S Web of Conferences
title Mathematical modeling of technological operations performed by trains at stations
title_full Mathematical modeling of technological operations performed by trains at stations
title_fullStr Mathematical modeling of technological operations performed by trains at stations
title_full_unstemmed Mathematical modeling of technological operations performed by trains at stations
title_short Mathematical modeling of technological operations performed by trains at stations
title_sort mathematical modeling of technological operations performed by trains at stations
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/97/e3sconf_bft2023_06002.pdf
work_keys_str_mv AT butunovdilmurod mathematicalmodelingoftechnologicaloperationsperformedbytrainsatstations
AT kalimbetovazhansaya mathematicalmodelingoftechnologicaloperationsperformedbytrainsatstations
AT abdukodirovsardor mathematicalmodelingoftechnologicaloperationsperformedbytrainsatstations
AT buriyevshuhrat mathematicalmodelingoftechnologicaloperationsperformedbytrainsatstations
AT tuxtaxodjayevamafiratxon mathematicalmodelingoftechnologicaloperationsperformedbytrainsatstations