TIME ANALYSIS ACCORDING TO PART PROGRAMS ON A CNC VERTICAL MACHINING CENTER

In this study, a program examining the CNC programs in the control unit of Dyna Myte 2900 Vertical Machining Center and calculating the machining time and rapid movement time of the cutting tools has been developed. The workpiece program to be examined is transferred to CNC code editor by the user...

Full description

Bibliographic Details
Main Authors: Ahmet Murat PİNAR, Abdulkadir GÜLLÜ
Format: Article
Language:English
Published: Pamukkale University 2002-01-01
Series:Pamukkale University Journal of Engineering Sciences
Subjects:
Online Access:http://dergipark.ulakbim.gov.tr/pajes/article/view/5000089784
Description
Summary:In this study, a program examining the CNC programs in the control unit of Dyna Myte 2900 Vertical Machining Center and calculating the machining time and rapid movement time of the cutting tools has been developed. The workpiece program to be examined is transferred to CNC code editor by the user manually, by a computer file with a diskette, or through hard disk or the machine tool. By examining all the movements of the cutting tools, detailed machining time, rapid movement time or total time is served to the user. So that, an important part of workpiece cost analysis information is provided.
ISSN:1300-7009
2147-5881