A long-term intelligent operation and management model of cascade hydropower stations based on chance constrained programming under multi-market coupling
Under the medium- and long-term electric markets, cascaded hydropower stations face a series of practical challenges due to the uncertainty of inflow and market price. For long-term dispatch scheduling, the allocation of power generation in multimarkets is critical, including clean energy priority c...
Main Authors: | Jia Lu, Gang Li, Chuntian Cheng, Benxi Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
IOP Publishing
2021-01-01
|
Series: | Environmental Research Letters |
Subjects: | |
Online Access: | https://doi.org/10.1088/1748-9326/abef90 |
Similar Items
-
Optimal Re-Dispatching of Cascaded Hydropower Plants Using Quadratic Programming and Chance-Constrained Programming
by: Krešimir Fekete, et al.
Published: (2019-04-01) -
Multi-Level Dependent-Chance Model for Hydropower Reservoir Operations
by: Xinyu Wu, et al.
Published: (2022-07-01) -
Optimal operation of cascade hydropower station based on interior point method
by: Shuai Feng, et al.
Published: (2022-08-01) -
A neurodynamic algorithm for dependent joint chance constrained geometric programs
by: Siham Tassouli, et al.
Published: (2023-09-01) -
Long-Term Generation Scheduling for Cascade Hydropower Plants Considering Price Correlation between Multiple Markets
by: Bin Luo, et al.
Published: (2019-06-01)