Determination of Necessary Subsidiary Track According to Train Operation Frequency in a Heterogeneous Train Pattern

In this study, a genetic algorithm was used to calculate the scheduled waiting time according to the train operation frequency of heterogeneous trains operating on one track. The acquired data were then used to determine the appropriate subsidiary track at which high-speed trains can load or release...

Full description

Bibliographic Details
Main Author: Hyoung June Kim
Format: Article
Language:English
Published: MDPI AG 2020-06-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/10/12/4164
Description
Summary:In this study, a genetic algorithm was used to calculate the scheduled waiting time according to the train operation frequency of heterogeneous trains operating on one track. The acquired data were then used to determine the appropriate subsidiary track at which high-speed trains can load or release cargo away from low-speed trains. A metaheuristic genetic algorithm was applied and implemented using Javascript/jQuery. Six cases were investigated, which provided values of subsidiary track that vary according to the operation frequencies of different types of trains, and solutions were derived through 100 simulations using a stochastic method. The analysis results showed that the train overtaking frequency was the highest at the third intermediate station within the simulation, suggesting that this particular station requires a subsidiary track, even if the operating frequency of each train differs across the entire track considered in this study. The results of this study are expected to facilitate objective and practical planning during railway construction.
ISSN:2076-3417