Determination of Necessary Subsidiary Track According to Train Operation Frequency in a Heterogeneous Train Pattern

In this study, a genetic algorithm was used to calculate the scheduled waiting time according to the train operation frequency of heterogeneous trains operating on one track. The acquired data were then used to determine the appropriate subsidiary track at which high-speed trains can load or release...

Full description

Bibliographic Details
Main Author: Hyoung June Kim
Format: Article
Language:English
Published: MDPI AG 2020-06-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/10/12/4164