Study on the gasket durability in the segment joint of subsurface excavated fabricated section

The aging of rubber will cause changes in the mechanical properties of materials, which in turn will cause waterproof failure.The section from the starting point of Beijing Metro Line 6 to Jin'anqiao is the first fabricated surface excavated tunnel in our country.It is of great significance to...

Full description

Bibliographic Details
Main Authors: Dong Linwei, Yang Zhiyong, Jiang Yusheng, Wang Zhenyong, Wang Hao, Sun Ziyue, Qi Mingyu
Format: Article
Language:English
Published: Emergency Management Press 2021-04-01
Series:矿业科学学报
Subjects:
Online Access:http://kykxxb.cumtb.edu.cn/cn/article/doi/10.19606/j.cnki.jmst.2021.02.007
_version_ 1797989695255216128
author Dong Linwei
Yang Zhiyong
Jiang Yusheng
Wang Zhenyong
Wang Hao
Sun Ziyue
Qi Mingyu
author_facet Dong Linwei
Yang Zhiyong
Jiang Yusheng
Wang Zhenyong
Wang Hao
Sun Ziyue
Qi Mingyu
author_sort Dong Linwei
collection DOAJ
description The aging of rubber will cause changes in the mechanical properties of materials, which in turn will cause waterproof failure.The section from the starting point of Beijing Metro Line 6 to Jin'anqiao is the first fabricated surface excavated tunnel in our country.It is of great significance to study the aging performance of the gaskets at the joints.The tunnel uses segments as the secondary lining structure, and EPDM gaskets as the waterproof material at the segment joints.In order to check whether the waterproof of the joints meets the durability requirements, an accelerated aging test was carried out on the rubber material of the gasket according to time-temperature equivalence principle, which predicts the service life of the rubber material.Due to the cumbersome calculation process of life prediction, the corresponding program was compiled to solve the problem of repeated trial calculation of parameters in the data processing.In addition, a numerical simulation of the stress of segment gaskets was carried out, and the influence of aging on the waterproof of the gasket was analyzed.It was pointed out that the designed water pressure of the gasket was increased to at least 1.75 times of the original one.
first_indexed 2024-04-11T08:24:34Z
format Article
id doaj.art-4efcf2edcbd94403869bdfdb294c757a
institution Directory Open Access Journal
issn 2096-2193
language English
last_indexed 2024-04-11T08:24:34Z
publishDate 2021-04-01
publisher Emergency Management Press
record_format Article
series 矿业科学学报
spelling doaj.art-4efcf2edcbd94403869bdfdb294c757a2022-12-22T04:34:49ZengEmergency Management Press矿业科学学报2096-21932021-04-016219620310.19606/j.cnki.jmst.2021.02.00720210207Study on the gasket durability in the segment joint of subsurface excavated fabricated sectionDong Linwei0Yang Zhiyong1Jiang Yusheng2Wang Zhenyong3Wang Hao4Sun Ziyue5Qi Mingyu6School of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaSchool of Mechanics and Civil Engineering, China University of Mining & Technology-Beijing, Beijing 100083, ChinaThe aging of rubber will cause changes in the mechanical properties of materials, which in turn will cause waterproof failure.The section from the starting point of Beijing Metro Line 6 to Jin'anqiao is the first fabricated surface excavated tunnel in our country.It is of great significance to study the aging performance of the gaskets at the joints.The tunnel uses segments as the secondary lining structure, and EPDM gaskets as the waterproof material at the segment joints.In order to check whether the waterproof of the joints meets the durability requirements, an accelerated aging test was carried out on the rubber material of the gasket according to time-temperature equivalence principle, which predicts the service life of the rubber material.Due to the cumbersome calculation process of life prediction, the corresponding program was compiled to solve the problem of repeated trial calculation of parameters in the data processing.In addition, a numerical simulation of the stress of segment gaskets was carried out, and the influence of aging on the waterproof of the gasket was analyzed.It was pointed out that the designed water pressure of the gasket was increased to at least 1.75 times of the original one.http://kykxxb.cumtb.edu.cn/cn/article/doi/10.19606/j.cnki.jmst.2021.02.007gasketservice lifeaccelerated aging testcompression setjoint waterproof
spellingShingle Dong Linwei
Yang Zhiyong
Jiang Yusheng
Wang Zhenyong
Wang Hao
Sun Ziyue
Qi Mingyu
Study on the gasket durability in the segment joint of subsurface excavated fabricated section
矿业科学学报
gasket
service life
accelerated aging test
compression set
joint waterproof
title Study on the gasket durability in the segment joint of subsurface excavated fabricated section
title_full Study on the gasket durability in the segment joint of subsurface excavated fabricated section
title_fullStr Study on the gasket durability in the segment joint of subsurface excavated fabricated section
title_full_unstemmed Study on the gasket durability in the segment joint of subsurface excavated fabricated section
title_short Study on the gasket durability in the segment joint of subsurface excavated fabricated section
title_sort study on the gasket durability in the segment joint of subsurface excavated fabricated section
topic gasket
service life
accelerated aging test
compression set
joint waterproof
url http://kykxxb.cumtb.edu.cn/cn/article/doi/10.19606/j.cnki.jmst.2021.02.007
work_keys_str_mv AT donglinwei studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT yangzhiyong studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT jiangyusheng studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT wangzhenyong studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT wanghao studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT sunziyue studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection
AT qimingyu studyonthegasketdurabilityinthesegmentjointofsubsurfaceexcavatedfabricatedsection