Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction

The goal of this paper is to yield insights into the forming, reinforcing, and pouring of concrete buildings, focusing on design, functionality, failure, and safety aspects. The concrete construction process has different moving parts along the form–pour–strip cycle, and the authors aimed to analyze...

Full description

Bibliographic Details
Main Authors: Liam Tierney, Md. Safiuddin
Format: Article
Language:English
Published: MDPI AG 2022-08-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/12/9/1303
_version_ 1797490394618920960
author Liam Tierney
Md. Safiuddin
author_facet Liam Tierney
Md. Safiuddin
author_sort Liam Tierney
collection DOAJ
description The goal of this paper is to yield insights into the forming, reinforcing, and pouring of concrete buildings, focusing on design, functionality, failure, and safety aspects. The concrete construction process has different moving parts along the form–pour–strip cycle, and the authors aimed to analyze the information pertaining to formwork and rebar design, reasons for failures of formwork and hardening concrete, various hazards on jobsites, and safe work practices. The intent of this study was to seek and analyze the experiences of industry professionals on the above-stated aspects. In total, five well-experienced industry professionals working in concrete forming, reinforcing, and pouring were interviewed. Through comparative analysis of the interview results, the authors were able to gather valuable data related to designs of formwork system and rebars, field practices, jobsite hazards, and safety requirements. Interview results revealed that functionality and applied loads are the determining factors in any design considerations when it comes to formwork system and rebars for concrete buildings. Another finding was that a construction project does not wait for a concrete element to reach its full compressive strength at 28 days before proceeding with the work since the element can hold most construction loads after 3 or 4 days. In addition, the failures which occur in concrete buildings are a result of formwork breakdown, defective formwork layout, and concrete damage due to corroded rebars and inadequate curing procedure. Lastly, interview results revealed that the single leading hazard during concrete works is working at heights which can be minimized using fall arrest systems or engineered guardrails for improved safety.
first_indexed 2024-03-10T00:32:23Z
format Article
id doaj.art-4f0b11c8a3354496b1f5e071fff3efd5
institution Directory Open Access Journal
issn 2075-5309
language English
last_indexed 2024-03-10T00:32:23Z
publishDate 2022-08-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj.art-4f0b11c8a3354496b1f5e071fff3efd52023-11-23T15:22:17ZengMDPI AGBuildings2075-53092022-08-01129130310.3390/buildings12091303Insights into Concrete Forming, Reinforcing, and Pouring in Building ConstructionLiam Tierney0Md. Safiuddin1Angelo DelZotto School of Construction Management, Centre for Construction and Engineering Technologies, George Brown College, 160 Kendal Avenue, Toronto, ON M5R 1M3, CanadaAngelo DelZotto School of Construction Management, Centre for Construction and Engineering Technologies, George Brown College, 160 Kendal Avenue, Toronto, ON M5R 1M3, CanadaThe goal of this paper is to yield insights into the forming, reinforcing, and pouring of concrete buildings, focusing on design, functionality, failure, and safety aspects. The concrete construction process has different moving parts along the form–pour–strip cycle, and the authors aimed to analyze the information pertaining to formwork and rebar design, reasons for failures of formwork and hardening concrete, various hazards on jobsites, and safe work practices. The intent of this study was to seek and analyze the experiences of industry professionals on the above-stated aspects. In total, five well-experienced industry professionals working in concrete forming, reinforcing, and pouring were interviewed. Through comparative analysis of the interview results, the authors were able to gather valuable data related to designs of formwork system and rebars, field practices, jobsite hazards, and safety requirements. Interview results revealed that functionality and applied loads are the determining factors in any design considerations when it comes to formwork system and rebars for concrete buildings. Another finding was that a construction project does not wait for a concrete element to reach its full compressive strength at 28 days before proceeding with the work since the element can hold most construction loads after 3 or 4 days. In addition, the failures which occur in concrete buildings are a result of formwork breakdown, defective formwork layout, and concrete damage due to corroded rebars and inadequate curing procedure. Lastly, interview results revealed that the single leading hazard during concrete works is working at heights which can be minimized using fall arrest systems or engineered guardrails for improved safety.https://www.mdpi.com/2075-5309/12/9/1303concretedesignfailureformworkfunctionalityhazards
spellingShingle Liam Tierney
Md. Safiuddin
Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
Buildings
concrete
design
failure
formwork
functionality
hazards
title Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
title_full Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
title_fullStr Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
title_full_unstemmed Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
title_short Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction
title_sort insights into concrete forming reinforcing and pouring in building construction
topic concrete
design
failure
formwork
functionality
hazards
url https://www.mdpi.com/2075-5309/12/9/1303
work_keys_str_mv AT liamtierney insightsintoconcreteformingreinforcingandpouringinbuildingconstruction
AT mdsafiuddin insightsintoconcreteformingreinforcingandpouringinbuildingconstruction