A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
To promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic...
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Shanghai Jiao Tong University
2023-09-01
|
Series: | Shanghai Jiaotong Daxue xuebao |
Subjects: | |
Online Access: | https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtml |
_version_ | 1797672482275065856 |
---|---|
author | CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai |
author_facet | CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai |
author_sort | CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai |
collection | DOAJ |
description | To promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic dispatch framework considering inter-provincial and intra-provincial bi-level market coordinated operation is proposed. In the day-ahead dispatch stage, an inter-provincial and intra-provincial bi-level economic dispatch model is constructed. In the intraday dispatch stage, an economic dispatch model considering the forecast error of source-load is constructed. To further deal with the influence of the uncertainty of source-load forecast on economic dispatch, a two-stage day-ahead and intraday distributionally robust economic dispatch model and its solution method are proposed, realizing the economic dispatch under random scene ambiguity set. Finally, a multi-sending ends and multi-receiving ends interconnected test system is constructed using IEEE 39-bus and 118-bus systems. The effectiveness of the proposed model and method is verified by simulation. |
first_indexed | 2024-03-11T21:30:42Z |
format | Article |
id | doaj.art-4fb09b93457b4f9eb0e112a249088d13 |
institution | Directory Open Access Journal |
issn | 1006-2467 |
language | zho |
last_indexed | 2024-03-11T21:30:42Z |
publishDate | 2023-09-01 |
publisher | Editorial Office of Journal of Shanghai Jiao Tong University |
record_format | Article |
series | Shanghai Jiaotong Daxue xuebao |
spelling | doaj.art-4fb09b93457b4f9eb0e112a249088d132023-09-27T08:58:38ZzhoEditorial Office of Journal of Shanghai Jiao Tong UniversityShanghai Jiaotong Daxue xuebao1006-24672023-09-015791114112510.16183/j.cnki.jsjtu.2022.121A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level MarketCHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai01. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, China;2. Power Dispatching and Control Center, State Grid Shanghai Municipal Electric Power Company, Shanghai 200122, China;3. China Electric Power Research Institute (Nanjing Branch), Nanjing 210003, ChinaTo promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic dispatch framework considering inter-provincial and intra-provincial bi-level market coordinated operation is proposed. In the day-ahead dispatch stage, an inter-provincial and intra-provincial bi-level economic dispatch model is constructed. In the intraday dispatch stage, an economic dispatch model considering the forecast error of source-load is constructed. To further deal with the influence of the uncertainty of source-load forecast on economic dispatch, a two-stage day-ahead and intraday distributionally robust economic dispatch model and its solution method are proposed, realizing the economic dispatch under random scene ambiguity set. Finally, a multi-sending ends and multi-receiving ends interconnected test system is constructed using IEEE 39-bus and 118-bus systems. The effectiveness of the proposed model and method is verified by simulation.https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtmlbi-level electricity markettwo-stage economic dispatchuncertainty of source-loadambiguity setdistributionally robust optimization |
spellingShingle | CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market Shanghai Jiaotong Daxue xuebao bi-level electricity market two-stage economic dispatch uncertainty of source-load ambiguity set distributionally robust optimization |
title | A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market |
title_full | A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market |
title_fullStr | A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market |
title_full_unstemmed | A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market |
title_short | A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market |
title_sort | two stage distributionally robust economic dispatch model under the coordination of inter provincial and intra provincial bi level market |
topic | bi-level electricity market two-stage economic dispatch uncertainty of source-load ambiguity set distributionally robust optimization |
url | https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtml |
work_keys_str_mv | AT chenyiwanghanxuxiaoyuanhuyoulinyanzhengzengdanfengkai atwostagedistributionallyrobusteconomicdispatchmodelunderthecoordinationofinterprovincialandintraprovincialbilevelmarket AT chenyiwanghanxuxiaoyuanhuyoulinyanzhengzengdanfengkai twostagedistributionallyrobusteconomicdispatchmodelunderthecoordinationofinterprovincialandintraprovincialbilevelmarket |