A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market

To promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic...

Full description

Bibliographic Details
Main Author: CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai
Format: Article
Language:zho
Published: Editorial Office of Journal of Shanghai Jiao Tong University 2023-09-01
Series:Shanghai Jiaotong Daxue xuebao
Subjects:
Online Access:https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtml
_version_ 1797672482275065856
author CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai
author_facet CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai
author_sort CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai
collection DOAJ
description To promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic dispatch framework considering inter-provincial and intra-provincial bi-level market coordinated operation is proposed. In the day-ahead dispatch stage, an inter-provincial and intra-provincial bi-level economic dispatch model is constructed. In the intraday dispatch stage, an economic dispatch model considering the forecast error of source-load is constructed. To further deal with the influence of the uncertainty of source-load forecast on economic dispatch, a two-stage day-ahead and intraday distributionally robust economic dispatch model and its solution method are proposed, realizing the economic dispatch under random scene ambiguity set. Finally, a multi-sending ends and multi-receiving ends interconnected test system is constructed using IEEE 39-bus and 118-bus systems. The effectiveness of the proposed model and method is verified by simulation.
first_indexed 2024-03-11T21:30:42Z
format Article
id doaj.art-4fb09b93457b4f9eb0e112a249088d13
institution Directory Open Access Journal
issn 1006-2467
language zho
last_indexed 2024-03-11T21:30:42Z
publishDate 2023-09-01
publisher Editorial Office of Journal of Shanghai Jiao Tong University
record_format Article
series Shanghai Jiaotong Daxue xuebao
spelling doaj.art-4fb09b93457b4f9eb0e112a249088d132023-09-27T08:58:38ZzhoEditorial Office of Journal of Shanghai Jiao Tong UniversityShanghai Jiaotong Daxue xuebao1006-24672023-09-015791114112510.16183/j.cnki.jsjtu.2022.121A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level MarketCHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai01. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, China;2. Power Dispatching and Control Center, State Grid Shanghai Municipal Electric Power Company, Shanghai 200122, China;3. China Electric Power Research Institute (Nanjing Branch), Nanjing 210003, ChinaTo promote the optimal allocation of resources across the country, China is actively developing inter-provincial electricity transactions, and will gradually form an inter-provincial and intra-provincial electricity market operation mode. In this context, a two-stage day-ahead, and intraday economic dispatch framework considering inter-provincial and intra-provincial bi-level market coordinated operation is proposed. In the day-ahead dispatch stage, an inter-provincial and intra-provincial bi-level economic dispatch model is constructed. In the intraday dispatch stage, an economic dispatch model considering the forecast error of source-load is constructed. To further deal with the influence of the uncertainty of source-load forecast on economic dispatch, a two-stage day-ahead and intraday distributionally robust economic dispatch model and its solution method are proposed, realizing the economic dispatch under random scene ambiguity set. Finally, a multi-sending ends and multi-receiving ends interconnected test system is constructed using IEEE 39-bus and 118-bus systems. The effectiveness of the proposed model and method is verified by simulation.https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtmlbi-level electricity markettwo-stage economic dispatchuncertainty of source-loadambiguity setdistributionally robust optimization
spellingShingle CHEN Yi, WANG Han, XU Xiaoyuan, HU Youlin, YAN Zheng, ZENG Dan, FENG Kai
A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
Shanghai Jiaotong Daxue xuebao
bi-level electricity market
two-stage economic dispatch
uncertainty of source-load
ambiguity set
distributionally robust optimization
title A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
title_full A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
title_fullStr A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
title_full_unstemmed A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
title_short A Two-Stage Distributionally Robust Economic Dispatch Model Under the Coordination of Inter-Provincial and Intra-Provincial Bi-Level Market
title_sort two stage distributionally robust economic dispatch model under the coordination of inter provincial and intra provincial bi level market
topic bi-level electricity market
two-stage economic dispatch
uncertainty of source-load
ambiguity set
distributionally robust optimization
url https://xuebao.sjtu.edu.cn/article/2023/1006-2467/1006-2467-57-9-1114.shtml
work_keys_str_mv AT chenyiwanghanxuxiaoyuanhuyoulinyanzhengzengdanfengkai atwostagedistributionallyrobusteconomicdispatchmodelunderthecoordinationofinterprovincialandintraprovincialbilevelmarket
AT chenyiwanghanxuxiaoyuanhuyoulinyanzhengzengdanfengkai twostagedistributionallyrobusteconomicdispatchmodelunderthecoordinationofinterprovincialandintraprovincialbilevelmarket