Laboratory Test Bed for Analyzing Fault-Detection Reaction Times of Protection Relays in Different Substation Topologies
Visions of energy transition focus on activating end users, meaning that numerous flexible-distribution network-level devices become active participants in power-system operations. This implies a fast, reliable, and secure exchange of data, enabling the distribution-system operators to maintain, or...
Main Authors: | Goran Jurišić, Juraj Havelka, Tomislav Capuder, Stjepan Sučić |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-09-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/9/2482 |
Similar Items
-
GOOSE Secure: A Comprehensive Dataset for In-Depth Analysis of GOOSE Spoofing Attacks in Digital Substations
by: Oscar A. Tobar-Rosero, et al.
Published: (2024-12-01) -
Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication
by: Miro Antonijević, et al.
Published: (2018-03-01) -
Protection Debugging of Digitized Substation Based on IEC 61850
by: YANG Mei, et al.
Published: (2010-11-01) -
CHECKING THE FUNCTIONALITY OF A NETWORK ON DATA EXCHANGE BETWEEN THE DEVICES ON THE DIGITAL SUBSTATION
by: Daria Tuchina, et al.
Published: (2022-03-01) -
A Novel Scheme for Performance Evaluation of an IEC 61850-Based Active Distribution System Substation
by: Taha Selim Ustun, et al.
Published: (2019-01-01)