Maintenance Optimization of High Voltage Substation Model

The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintena...

Full description

Bibliographic Details
Main Authors: Radim Bris, Jan Gala
Format: Article
Language:English
Published: VSB-Technical University of Ostrava 2008-01-01
Series:Advances in Electrical and Electronic Engineering
Subjects:
Online Access:http://advances.utc.sk/index.php/AEEE/article/view/88
_version_ 1797827184378773504
author Radim Bris
Jan Gala
author_facet Radim Bris
Jan Gala
author_sort Radim Bris
collection DOAJ
description The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair - MTTR.<br />
first_indexed 2024-04-09T12:44:11Z
format Article
id doaj.art-52ae05e9d076457fa451662b6d4cd1fa
institution Directory Open Access Journal
issn 1336-1376
1804-3119
language English
last_indexed 2024-04-09T12:44:11Z
publishDate 2008-01-01
publisher VSB-Technical University of Ostrava
record_format Article
series Advances in Electrical and Electronic Engineering
spelling doaj.art-52ae05e9d076457fa451662b6d4cd1fa2023-05-14T20:50:04ZengVSB-Technical University of OstravaAdvances in Electrical and Electronic Engineering1336-13761804-31192008-01-0171 - 215816175Maintenance Optimization of High Voltage Substation ModelRadim BrisJan GalaThe real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair - MTTR.<br />http://advances.utc.sk/index.php/AEEE/article/view/88high voltagemean time to repaircalculations.
spellingShingle Radim Bris
Jan Gala
Maintenance Optimization of High Voltage Substation Model
Advances in Electrical and Electronic Engineering
high voltage
mean time to repair
calculations.
title Maintenance Optimization of High Voltage Substation Model
title_full Maintenance Optimization of High Voltage Substation Model
title_fullStr Maintenance Optimization of High Voltage Substation Model
title_full_unstemmed Maintenance Optimization of High Voltage Substation Model
title_short Maintenance Optimization of High Voltage Substation Model
title_sort maintenance optimization of high voltage substation model
topic high voltage
mean time to repair
calculations.
url http://advances.utc.sk/index.php/AEEE/article/view/88
work_keys_str_mv AT radimbris maintenanceoptimizationofhighvoltagesubstationmodel
AT jangala maintenanceoptimizationofhighvoltagesubstationmodel