Maintenance Optimization of High Voltage Substation Model
The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintena...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
VSB-Technical University of Ostrava
2008-01-01
|
Series: | Advances in Electrical and Electronic Engineering |
Subjects: | |
Online Access: | http://advances.utc.sk/index.php/AEEE/article/view/88 |
_version_ | 1797827184378773504 |
---|---|
author | Radim Bris Jan Gala |
author_facet | Radim Bris Jan Gala |
author_sort | Radim Bris |
collection | DOAJ |
description | The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair - MTTR.<br /> |
first_indexed | 2024-04-09T12:44:11Z |
format | Article |
id | doaj.art-52ae05e9d076457fa451662b6d4cd1fa |
institution | Directory Open Access Journal |
issn | 1336-1376 1804-3119 |
language | English |
last_indexed | 2024-04-09T12:44:11Z |
publishDate | 2008-01-01 |
publisher | VSB-Technical University of Ostrava |
record_format | Article |
series | Advances in Electrical and Electronic Engineering |
spelling | doaj.art-52ae05e9d076457fa451662b6d4cd1fa2023-05-14T20:50:04ZengVSB-Technical University of OstravaAdvances in Electrical and Electronic Engineering1336-13761804-31192008-01-0171 - 215816175Maintenance Optimization of High Voltage Substation ModelRadim BrisJan GalaThe real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV) substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized), the failure rate and mean time to repair - MTTR.<br />http://advances.utc.sk/index.php/AEEE/article/view/88high voltagemean time to repaircalculations. |
spellingShingle | Radim Bris Jan Gala Maintenance Optimization of High Voltage Substation Model Advances in Electrical and Electronic Engineering high voltage mean time to repair calculations. |
title | Maintenance Optimization of High Voltage Substation Model |
title_full | Maintenance Optimization of High Voltage Substation Model |
title_fullStr | Maintenance Optimization of High Voltage Substation Model |
title_full_unstemmed | Maintenance Optimization of High Voltage Substation Model |
title_short | Maintenance Optimization of High Voltage Substation Model |
title_sort | maintenance optimization of high voltage substation model |
topic | high voltage mean time to repair calculations. |
url | http://advances.utc.sk/index.php/AEEE/article/view/88 |
work_keys_str_mv | AT radimbris maintenanceoptimizationofhighvoltagesubstationmodel AT jangala maintenanceoptimizationofhighvoltagesubstationmodel |