Investigation of the Pilot Industrial Works Efficiency on the Infill Well Spacing on the Bashkirian Deposits of Sokolkinsky Field with the Use of the Geological‑Technological Model
In this paper, to assess the effectiveness of pilot industrial works on the infill well spacing in the Bashkirian deposits of Sokolkinsky field, factors affecting the final technological indicators are identified. It is possible to refer the following factors to such category: the number of simultan...
Main Authors: | A.G. Khabibrakhmanov, I.N. Khakimzyanov, R.I. Sheshdirov |
---|---|
Format: | Article |
Language: | English |
Published: |
Georesursy Ltd.
2017-08-01
|
Series: | Georesursy |
Subjects: | |
Online Access: | https://geors.ru/archive/article/888/ |
Similar Items
-
Interference mechanism in coalbed methane wells and impacts on infill adjustment for existing well patterns
by: Qifeng Jia, et al.
Published: (2022-11-01) -
Comparison Different Techniques of Optimum Location for Infill Well Drilling
by: Sajjad H. Al-adliy, et al.
Published: (2024-03-01) -
Investigating the effect of heterogeneity on infill wells
by: Mahmood Bagheri, et al.
Published: (2015-12-01) -
Effect of Infill Pattern, Infill Density, and Infill Angle on the Printing Time and Filament Length of 3D Printing
by: Jaya Suteja
Published: (2021-05-01) -
A New Method for Determining Economic Well Pattern Density and Infilling Time of Tight Gas Reservoirs
by: Daye Wang, et al.
Published: (2024-03-01)