The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study

This article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and...

Full description

Bibliographic Details
Main Author: Szymon Haładyn
Format: Article
Language:English
Published: MDPI AG 2021-08-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/14/16/4781
_version_ 1827685352883617792
author Szymon Haładyn
author_facet Szymon Haładyn
author_sort Szymon Haładyn
collection DOAJ
description This article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and characterise the power supply system in use, pointing out its weaknesses. We consider a case study. The load of the power supply network generated by the rolling stock used in Poland was examined using a microsimulation. A real train timetable was taken into account on a fragment of one of the most important railway line sections in one of the urban agglomerations. Then the results were compared with the results of a microsimulation in which old units were replaced by new trains. These tests were carried out in several variants. We found critical points in the scheduling of railway system use. Our results indicate that it is becoming increasingly necessary to take into account the permissible load capacity of the supply network in certain traffic situations in the process of timetable construction.
first_indexed 2024-03-10T08:51:34Z
format Article
id doaj.art-52f43eb091cf4fdc8fcb8e7261d3b405
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-10T08:51:34Z
publishDate 2021-08-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-52f43eb091cf4fdc8fcb8e7261d3b4052023-11-22T07:27:18ZengMDPI AGEnergies1996-10732021-08-011416478110.3390/en14164781The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case StudySzymon Haładyn0Faculty of Mechanical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, PolandThis article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and characterise the power supply system in use, pointing out its weaknesses. We consider a case study. The load of the power supply network generated by the rolling stock used in Poland was examined using a microsimulation. A real train timetable was taken into account on a fragment of one of the most important railway line sections in one of the urban agglomerations. Then the results were compared with the results of a microsimulation in which old units were replaced by new trains. These tests were carried out in several variants. We found critical points in the scheduling of railway system use. Our results indicate that it is becoming increasingly necessary to take into account the permissible load capacity of the supply network in certain traffic situations in the process of timetable construction.https://www.mdpi.com/1996-1073/14/16/4781railway DC power supply systemrailway case studyquality of rail power supply
spellingShingle Szymon Haładyn
The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
Energies
railway DC power supply system
railway case study
quality of rail power supply
title The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
title_full The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
title_fullStr The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
title_full_unstemmed The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
title_short The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
title_sort problem of train scheduling in the context of the load on the power supply infrastructure a case study
topic railway DC power supply system
railway case study
quality of rail power supply
url https://www.mdpi.com/1996-1073/14/16/4781
work_keys_str_mv AT szymonhaładyn theproblemoftrainschedulinginthecontextoftheloadonthepowersupplyinfrastructureacasestudy
AT szymonhaładyn problemoftrainschedulinginthecontextoftheloadonthepowersupplyinfrastructureacasestudy