The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study
This article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-08-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/16/4781 |
_version_ | 1827685352883617792 |
---|---|
author | Szymon Haładyn |
author_facet | Szymon Haładyn |
author_sort | Szymon Haładyn |
collection | DOAJ |
description | This article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and characterise the power supply system in use, pointing out its weaknesses. We consider a case study. The load of the power supply network generated by the rolling stock used in Poland was examined using a microsimulation. A real train timetable was taken into account on a fragment of one of the most important railway line sections in one of the urban agglomerations. Then the results were compared with the results of a microsimulation in which old units were replaced by new trains. These tests were carried out in several variants. We found critical points in the scheduling of railway system use. Our results indicate that it is becoming increasingly necessary to take into account the permissible load capacity of the supply network in certain traffic situations in the process of timetable construction. |
first_indexed | 2024-03-10T08:51:34Z |
format | Article |
id | doaj.art-52f43eb091cf4fdc8fcb8e7261d3b405 |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-03-10T08:51:34Z |
publishDate | 2021-08-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-52f43eb091cf4fdc8fcb8e7261d3b4052023-11-22T07:27:18ZengMDPI AGEnergies1996-10732021-08-011416478110.3390/en14164781The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case StudySzymon Haładyn0Faculty of Mechanical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, PolandThis article deals with the new challenges facing modernising railways in Poland. We look at the problem of the efficiency of the power supply system (3 kV DC) used in the context of the increasing use of electric vehicles, which have a higher demand for electricity than the old type. We present and characterise the power supply system in use, pointing out its weaknesses. We consider a case study. The load of the power supply network generated by the rolling stock used in Poland was examined using a microsimulation. A real train timetable was taken into account on a fragment of one of the most important railway line sections in one of the urban agglomerations. Then the results were compared with the results of a microsimulation in which old units were replaced by new trains. These tests were carried out in several variants. We found critical points in the scheduling of railway system use. Our results indicate that it is becoming increasingly necessary to take into account the permissible load capacity of the supply network in certain traffic situations in the process of timetable construction.https://www.mdpi.com/1996-1073/14/16/4781railway DC power supply systemrailway case studyquality of rail power supply |
spellingShingle | Szymon Haładyn The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study Energies railway DC power supply system railway case study quality of rail power supply |
title | The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study |
title_full | The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study |
title_fullStr | The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study |
title_full_unstemmed | The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study |
title_short | The Problem of Train Scheduling in the Context of the Load on the Power Supply Infrastructure. A Case Study |
title_sort | problem of train scheduling in the context of the load on the power supply infrastructure a case study |
topic | railway DC power supply system railway case study quality of rail power supply |
url | https://www.mdpi.com/1996-1073/14/16/4781 |
work_keys_str_mv | AT szymonhaładyn theproblemoftrainschedulinginthecontextoftheloadonthepowersupplyinfrastructureacasestudy AT szymonhaładyn problemoftrainschedulinginthecontextoftheloadonthepowersupplyinfrastructureacasestudy |