Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking

The pipe jacking method is gradually attracting increasing levels of attention and is becoming an important method for constructing underground engineering. However, jacking large-size concrete pipes in urban core areas subjected to complicated geological conditions is still a big problem preventing...

Full description

Bibliographic Details
Main Authors: Minglei Ma, Lei Han, Yuanhao Wu, Quanying Li, Yongxing Zhang
Format: Article
Language:English
Published: MDPI AG 2023-08-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/13/15/8901
_version_ 1797587014080528384
author Minglei Ma
Lei Han
Yuanhao Wu
Quanying Li
Yongxing Zhang
author_facet Minglei Ma
Lei Han
Yuanhao Wu
Quanying Li
Yongxing Zhang
author_sort Minglei Ma
collection DOAJ
description The pipe jacking method is gradually attracting increasing levels of attention and is becoming an important method for constructing underground engineering. However, jacking large-size concrete pipes in urban core areas subjected to complicated geological conditions is still a big problem preventing the employment of the pipe jacking method, and further studies related to pipe jacking are required. This paper presents a case study on the construction of three parallel large-size reinforced concrete circular pipes in the upper-soft and lower-hard composite formations, in which the construction work was implemented using the slurry balance pipe jacking method with the sequence of jacking the 1# and 3# pipes prior to the 2# pipe being implemented in field construction. This case study was implemented by employing numerical simulations with the aforementioned pipe jacking sequence, which focused on the stress and deformation variations of the reinforced concrete circular pipes, as well as the vertical settlement of the ground surface during the jacking processes, and considering the influences from the excavation pressure and grouting pressure of the drag-reducing thixotropic slurry. The simulation results revealed that a higher excavation pressure from the pipe jacking machine can easily induce an excessive pushing and squeezing effect of the excavated soil with the uplift phenomenon, while the increasing grouting pressure can be used to reduce the overall vertical settlement of the ground surface, whereas an excessive grouting pressure may have no effectiveness on protecting the reinforced concrete circular pipes. This work provides the numerical foundations for investigating the behavior of jacked parallel large-size reinforced concrete circular pipes.
first_indexed 2024-03-11T00:31:15Z
format Article
id doaj.art-53e9e3efe6394866807fa65520c32590
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-03-11T00:31:15Z
publishDate 2023-08-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-53e9e3efe6394866807fa65520c325902023-11-18T22:39:02ZengMDPI AGApplied Sciences2076-34172023-08-011315890110.3390/app13158901Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe JackingMinglei Ma0Lei Han1Yuanhao Wu2Quanying Li3Yongxing Zhang4China Construction Eighth Engineering Division Co., Ltd., Shanghai 200135, ChinaChina Construction Eighth Engineering Division Co., Ltd., Shanghai 200135, ChinaChina Construction Eighth Engineering Division Co., Ltd., Shanghai 200135, ChinaChina Construction Eighth Engineering Division Co., Ltd., Shanghai 200135, ChinaSchool of Civil Engineering, Nanjing Forestry University, Nanjing 210037, ChinaThe pipe jacking method is gradually attracting increasing levels of attention and is becoming an important method for constructing underground engineering. However, jacking large-size concrete pipes in urban core areas subjected to complicated geological conditions is still a big problem preventing the employment of the pipe jacking method, and further studies related to pipe jacking are required. This paper presents a case study on the construction of three parallel large-size reinforced concrete circular pipes in the upper-soft and lower-hard composite formations, in which the construction work was implemented using the slurry balance pipe jacking method with the sequence of jacking the 1# and 3# pipes prior to the 2# pipe being implemented in field construction. This case study was implemented by employing numerical simulations with the aforementioned pipe jacking sequence, which focused on the stress and deformation variations of the reinforced concrete circular pipes, as well as the vertical settlement of the ground surface during the jacking processes, and considering the influences from the excavation pressure and grouting pressure of the drag-reducing thixotropic slurry. The simulation results revealed that a higher excavation pressure from the pipe jacking machine can easily induce an excessive pushing and squeezing effect of the excavated soil with the uplift phenomenon, while the increasing grouting pressure can be used to reduce the overall vertical settlement of the ground surface, whereas an excessive grouting pressure may have no effectiveness on protecting the reinforced concrete circular pipes. This work provides the numerical foundations for investigating the behavior of jacked parallel large-size reinforced concrete circular pipes.https://www.mdpi.com/2076-3417/13/15/8901behavior investigationlarge-size reinforced concrete circular pipethree parallel pipepipe jacking methodnumerical investigation
spellingShingle Minglei Ma
Lei Han
Yuanhao Wu
Quanying Li
Yongxing Zhang
Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
Applied Sciences
behavior investigation
large-size reinforced concrete circular pipe
three parallel pipe
pipe jacking method
numerical investigation
title Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
title_full Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
title_fullStr Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
title_full_unstemmed Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
title_short Behavioral Investigations of Three Parallel Large Reinforced Concrete Circular Pipes with the Construction of Pipe Jacking
title_sort behavioral investigations of three parallel large reinforced concrete circular pipes with the construction of pipe jacking
topic behavior investigation
large-size reinforced concrete circular pipe
three parallel pipe
pipe jacking method
numerical investigation
url https://www.mdpi.com/2076-3417/13/15/8901
work_keys_str_mv AT mingleima behavioralinvestigationsofthreeparallellargereinforcedconcretecircularpipeswiththeconstructionofpipejacking
AT leihan behavioralinvestigationsofthreeparallellargereinforcedconcretecircularpipeswiththeconstructionofpipejacking
AT yuanhaowu behavioralinvestigationsofthreeparallellargereinforcedconcretecircularpipeswiththeconstructionofpipejacking
AT quanyingli behavioralinvestigationsofthreeparallellargereinforcedconcretecircularpipeswiththeconstructionofpipejacking
AT yongxingzhang behavioralinvestigationsofthreeparallellargereinforcedconcretecircularpipeswiththeconstructionofpipejacking