Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution

Tunneling projects face several risks during the execution stage that affect the execution objectives (cost, time, quality, and safety). This study aimed to define the main execution activities of machinery tunnels with the associated risk factors and to develop a model for evaluating and analyzing...

Full description

Bibliographic Details
Main Authors: Mohamed A. Eid, Jong Wan Hu, Usama Issa
Format: Article
Language:English
Published: MDPI AG 2023-07-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/13/7/1757
_version_ 1797589958276415488
author Mohamed A. Eid
Jong Wan Hu
Usama Issa
author_facet Mohamed A. Eid
Jong Wan Hu
Usama Issa
author_sort Mohamed A. Eid
collection DOAJ
description Tunneling projects face several risks during the execution stage that affect the execution objectives (cost, time, quality, and safety). This study aimed to define the main execution activities of machinery tunnels with the associated risk factors and to develop a model for evaluating and analyzing the effects of the risk factors on the execution stage. The recognized activities of executing tunnels included the following: (A01) thrust and reception shaft installation; (A02) machine setup and break-in; (A03) machine progression and lining placing; and (A04) machine break-out and removal. Additionally, thirty-two risk factors associated with these activities were identified. Risk factor probability of occurrence and impacts on cost, time, quality, and safety were determined. Due to this risky and uncertain environment, the fuzzy logic method was applied for developing a model to analyze the effects of the risks on the tunneling process. The model was applied and verified using data collected in Egypt. Many correlations were determined among risk factors that affected tunneling execution objectives, resulting in close relationships with each other. The results emphasized many significant risk factors, such as “conflict between technical geological report and the ground nature”, and “shaft wall damage during break-out”. A03, which is related to machine progression and lining placing, was declared the riskiest activity group during tunneling execution. Further, safety was rated as the objective most affected by risks. The risk model presented in this study can be modified and applied to other cases, while the results and key risks can support the decision-makers who deal with tunneling construction.
first_indexed 2024-03-11T01:13:32Z
format Article
id doaj.art-547d346cf3784ca587c3a021fecbfb0c
institution Directory Open Access Journal
issn 2075-5309
language English
last_indexed 2024-03-11T01:13:32Z
publishDate 2023-07-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj.art-547d346cf3784ca587c3a021fecbfb0c2023-11-18T18:38:28ZengMDPI AGBuildings2075-53092023-07-01137175710.3390/buildings13071757Developing a Model for Analyzing Risks Affecting Machinery Tunnel ExecutionMohamed A. Eid0Jong Wan Hu1Usama Issa2Civil Engineering Department, Faculty of Engineering, Minia University, Minia 61519, EgyptDepartment of Civil and Environmental Engineering, Incheon National University, Incheon 22022, Republic of KoreaCivil Engineering Department, College of Engineering, Taif University, P.O. Box 11099, Taif 21944, Saudi ArabiaTunneling projects face several risks during the execution stage that affect the execution objectives (cost, time, quality, and safety). This study aimed to define the main execution activities of machinery tunnels with the associated risk factors and to develop a model for evaluating and analyzing the effects of the risk factors on the execution stage. The recognized activities of executing tunnels included the following: (A01) thrust and reception shaft installation; (A02) machine setup and break-in; (A03) machine progression and lining placing; and (A04) machine break-out and removal. Additionally, thirty-two risk factors associated with these activities were identified. Risk factor probability of occurrence and impacts on cost, time, quality, and safety were determined. Due to this risky and uncertain environment, the fuzzy logic method was applied for developing a model to analyze the effects of the risks on the tunneling process. The model was applied and verified using data collected in Egypt. Many correlations were determined among risk factors that affected tunneling execution objectives, resulting in close relationships with each other. The results emphasized many significant risk factors, such as “conflict between technical geological report and the ground nature”, and “shaft wall damage during break-out”. A03, which is related to machine progression and lining placing, was declared the riskiest activity group during tunneling execution. Further, safety was rated as the objective most affected by risks. The risk model presented in this study can be modified and applied to other cases, while the results and key risks can support the decision-makers who deal with tunneling construction.https://www.mdpi.com/2075-5309/13/7/1757machinery tunneltunneling projectrisk analysisfuzzy logic
spellingShingle Mohamed A. Eid
Jong Wan Hu
Usama Issa
Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
Buildings
machinery tunnel
tunneling project
risk analysis
fuzzy logic
title Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
title_full Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
title_fullStr Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
title_full_unstemmed Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
title_short Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution
title_sort developing a model for analyzing risks affecting machinery tunnel execution
topic machinery tunnel
tunneling project
risk analysis
fuzzy logic
url https://www.mdpi.com/2075-5309/13/7/1757
work_keys_str_mv AT mohamedaeid developingamodelforanalyzingrisksaffectingmachinerytunnelexecution
AT jongwanhu developingamodelforanalyzingrisksaffectingmachinerytunnelexecution
AT usamaissa developingamodelforanalyzingrisksaffectingmachinerytunnelexecution