Topographical survey work and stake out of an agroindustrial building from Periam village, Timis county

The main objective of the project was to achieve a topographic survey works and mapping of an agro-purpose storage for vegetables and fruits produced by the existing farms from the village. The work theme includes achieving of cadastral plans base on a 1/5000 scale, using  measurements for all stud...

Full description

Bibliographic Details
Main Authors: Livia Luminita Barliba, Costel Barliba, adrian Smuleac
Format: Article
Language:English
Published: AcademicPres 2016-11-01
Series:Bulletin of University of Agricultural Sciences and Veterinary Medicine Cluj-Napoca: Horticulture
Subjects:
Online Access:http://journals.usamvcluj.ro/index.php/horticulture/article/view/12274
Description
Summary:The main objective of the project was to achieve a topographic survey works and mapping of an agro-purpose storage for vegetables and fruits produced by the existing farms from the village. The work theme includes achieving of cadastral plans base on a 1/5000 scale, using  measurements for all studied locations and land cadastre units. GPS technology used in thickening RGNS, namely the determination of network support, lead to the lifting of all topographical stake out of  the contour points. (Bârliba Luminiţa Livia, et. all.,2004), After that, the points were used as starting points for execution the tracing of the surface construction with the support of a total station. For topographical survey was used a V82 South GNSS receiver with two frequencies and 7 channels which allows RTK positioning in real time and then it was used  permanent topographic station nearby Timisoara (TIM1.2.3). After overlapping the situation plan and  plan developed by an architect, it was made the stake out of industrial building’s foundation with Leica Total Station 1205+, through the dedicated "Stakeout" software. Topographical works generally pursue two base objectives: the topographical survey completed by a digital representation of a small land area and staking out the construction building  respectively implementing the projects on the ground (Bârliba Luminiţa Livia, et. all.,2005). This paper demonstrated that it is possible to achieve the optimal time of all field and office operations with precision and accuracy parameters required by the topographical laws and rules.