Numerical Simulation of Construction Disturbances during Bidirectional Advancement of Undersea Large-Diameter Dual-Line Shield Tunneling
Relying on the Mawan undersea large-diameter, dual-line, mud–water-balanced shield tunnel project and focusing on the characteristics of the tunnel, such as the complex geological conditions at the expected intersection location and the existence of a superimposed perturbation or secondary perturbat...
Main Authors: | Tao Wang, Yu Xiang, Liyuan Liu, Wang Xiong |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-03-01
|
Series: | Journal of Marine Science and Engineering |
Subjects: | |
Online Access: | https://www.mdpi.com/2077-1312/12/3/456 |
Similar Items
-
Stress Analysis of Large-diameter Undersea Shield Tunnel Lining Segments during Construction Process
by: MA Fenghai, et al.
Published: (2024-08-01) -
Response of operating metro tunnels to compensation grouting of an underlying large-diameter shield tunnel: A case study in Hangzhou
by: Xiaolu Gan, et al.
Published: (2022-04-01) -
Development and consideration of Chinese super-large diameter shield tunnel
by: Wei Qiu, et al.
Published: (2024-03-01) -
Risks analysis of large diameter slurry shield tunneling in urban area
by: Yi Zeng, et al.
Published: (2023-12-01) -
Analysis of EEG characteristics of drivers and driving safety in undersea tunnel
by: Yang, Yongzheng, et al.
Published: (2022)