Reinventing Formulas for Construction Project Delay Index Due to Management and Production

The objective of this study is to construct a precise formula for the management and production delay indicators that are integrated into Ms. Project's dashboard. Two simulation techniques, such as the manual formula computation and calculation integrated into the Ms. Project dashboard, were em...

Full description

Bibliographic Details
Main Authors: Putri Lynna A. Luthan, Nathanael Sitanggang, Syafriandi Syafriandi
Format: Article
Language:English
Published: Ital Publication 2023-12-01
Series:HighTech and Innovation Journal
Subjects:
Online Access:https://hightechjournal.org/index.php/HIJ/article/view/548
_version_ 1797296137612296192
author Putri Lynna A. Luthan
Nathanael Sitanggang
Syafriandi Syafriandi
author_facet Putri Lynna A. Luthan
Nathanael Sitanggang
Syafriandi Syafriandi
author_sort Putri Lynna A. Luthan
collection DOAJ
description The objective of this study is to construct a precise formula for the management and production delay indicators that are integrated into Ms. Project's dashboard. Two simulation techniques, such as the manual formula computation and calculation integrated into the Ms. Project dashboard, were employed. Due to management and the production team's tardiness, the data were obtained through trial-and-error methods. Excel was used to analyze the data, and Ms. Project was used to enter the calculations. The research showed that the Ms. Project dashboard formula gave more detailed information about the construction project, including: (1) contract value; (2) actual progress value during monitoring; (3) value of plan progress during monitoring; (4) progress deviation; (5) cause of delay; and (6) management delay index and production delay index. The novelty of this study is that project delays have traditionally been held against the production party (contractor), whereas implementation delays have never been taken against the management party (consultant). However, using this method makes it evident who is responsible for a project delay, whether it comes from management (a consultant) or the manufacturing side (a contractor).   Doi: 10.28991/HIJ-2023-04-04-06 Full Text: PDF
first_indexed 2024-03-07T21:59:01Z
format Article
id doaj.art-58408aebeae74e05b156cc4e3fc70afc
institution Directory Open Access Journal
issn 2723-9535
language English
last_indexed 2024-03-07T21:59:01Z
publishDate 2023-12-01
publisher Ital Publication
record_format Article
series HighTech and Innovation Journal
spelling doaj.art-58408aebeae74e05b156cc4e3fc70afc2024-02-24T06:59:12ZengItal PublicationHighTech and Innovation Journal2723-95352023-12-014476877810.28991/HIJ-2023-04-04-06153Reinventing Formulas for Construction Project Delay Index Due to Management and ProductionPutri Lynna A. Luthan0Nathanael Sitanggang1Syafriandi Syafriandi2Department of Construction Management, Faculty of Engineering, Universitas Negeri Medan, Medan 20221,Department of Building Engineering Science, Faculty of Engineering, Universitas Negeri Medan, Medan 20221,Head of Project Scheduling Experts Indonesia (PAPPI), Padang 25133,The objective of this study is to construct a precise formula for the management and production delay indicators that are integrated into Ms. Project's dashboard. Two simulation techniques, such as the manual formula computation and calculation integrated into the Ms. Project dashboard, were employed. Due to management and the production team's tardiness, the data were obtained through trial-and-error methods. Excel was used to analyze the data, and Ms. Project was used to enter the calculations. The research showed that the Ms. Project dashboard formula gave more detailed information about the construction project, including: (1) contract value; (2) actual progress value during monitoring; (3) value of plan progress during monitoring; (4) progress deviation; (5) cause of delay; and (6) management delay index and production delay index. The novelty of this study is that project delays have traditionally been held against the production party (contractor), whereas implementation delays have never been taken against the management party (consultant). However, using this method makes it evident who is responsible for a project delay, whether it comes from management (a consultant) or the manufacturing side (a contractor).   Doi: 10.28991/HIJ-2023-04-04-06 Full Text: PDFhttps://hightechjournal.org/index.php/HIJ/article/view/548formulaindex of delaymanagementproduction.
spellingShingle Putri Lynna A. Luthan
Nathanael Sitanggang
Syafriandi Syafriandi
Reinventing Formulas for Construction Project Delay Index Due to Management and Production
HighTech and Innovation Journal
formula
index of delay
management
production.
title Reinventing Formulas for Construction Project Delay Index Due to Management and Production
title_full Reinventing Formulas for Construction Project Delay Index Due to Management and Production
title_fullStr Reinventing Formulas for Construction Project Delay Index Due to Management and Production
title_full_unstemmed Reinventing Formulas for Construction Project Delay Index Due to Management and Production
title_short Reinventing Formulas for Construction Project Delay Index Due to Management and Production
title_sort reinventing formulas for construction project delay index due to management and production
topic formula
index of delay
management
production.
url https://hightechjournal.org/index.php/HIJ/article/view/548
work_keys_str_mv AT putrilynnaaluthan reinventingformulasforconstructionprojectdelayindexduetomanagementandproduction
AT nathanaelsitanggang reinventingformulasforconstructionprojectdelayindexduetomanagementandproduction
AT syafriandisyafriandi reinventingformulasforconstructionprojectdelayindexduetomanagementandproduction