Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators

Background: In 2010, the Zimbabwe Ministry of Health and Child Welfare (MoHCW) adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme as a tool for laboratory quality systems strengthening. Objectives: To evaluate the financial costs of SLMTA implementation using two...

Full description

Bibliographic Details
Main Authors: Edwin Shumba, Phoebe Nzombe, Absolom Mbinda, Raiva Simbi, Douglas Mangwanya, Peter H. Kilmarx, Elizabeth T. Luman, Sibongile N. Zimuto
Format: Article
Language:English
Published: AOSIS 2014-11-01
Series:African Journal of Laboratory Medicine
Online Access:https://ajlmonline.org/index.php/ajlm/article/view/248
_version_ 1811302369609121792
author Edwin Shumba
Phoebe Nzombe
Absolom Mbinda
Raiva Simbi
Douglas Mangwanya
Peter H. Kilmarx
Elizabeth T. Luman
Sibongile N. Zimuto
author_facet Edwin Shumba
Phoebe Nzombe
Absolom Mbinda
Raiva Simbi
Douglas Mangwanya
Peter H. Kilmarx
Elizabeth T. Luman
Sibongile N. Zimuto
author_sort Edwin Shumba
collection DOAJ
description Background: In 2010, the Zimbabwe Ministry of Health and Child Welfare (MoHCW) adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme as a tool for laboratory quality systems strengthening. Objectives: To evaluate the financial costs of SLMTA implementation using two models (external facilitators; and internal local or MoHCW facilitators) from the perspective of the implementing partner and to estimate resources needed to scale up the programme nationally in all 10 provinces. Methods: The average expenditure per laboratory was calculated based on accounting records; calculations included implementing partner expenses but excluded in-kind contributions and salaries of local facilitators and trainees. We also estimated theoretical financial costs, keeping all contextual variables constant across the two models. Resource needs for future national expansion were estimated based on a two-phase implementation plan, in which 12 laboratories in each of five provinces would implement SLMTA per phase; for the internal facilitator model, 20 facilitators would be trained at the beginning of each phase. Results: The average expenditure to implement SLMTA in 11 laboratories using external facilitators was approximately US$5800 per laboratory; expenditure in 19 laboratories using internal facilitators was approximately $6000 per laboratory. The theoretical financial cost of implementing a 12-laboratory SLMTA cohort keeping all contextual variables constant would be approximately $58 000 using external facilitators; or $15 000 using internal facilitators, plus $86 000 to train 20 facilitators. The financial cost for subsequent SLMTA cohorts using the previously-trained internal facilitators would be approximately $15 000, yielding a break-even point of 2 cohorts, at $116 000 for either model. Estimated resources required for national implementation in 120 laboratories would therefore be $580 000 using external facilitators ($58 000 per province) and $322 000 using internal facilitators ($86 000 for facilitator training in each of two phases plus $15 000 for SLMTA implementation in each province). Conclusion: Investing in training of internal facilitators will result in substantial savings over the scale-up of the programme. Our study provides information to assist policy makers to develop strategic plans for investing in laboratory strengthening.
first_indexed 2024-04-13T07:26:54Z
format Article
id doaj.art-599304b414584c71a254ca072a1a3ee0
institution Directory Open Access Journal
issn 2225-2002
2225-2010
language English
last_indexed 2024-04-13T07:26:54Z
publishDate 2014-11-01
publisher AOSIS
record_format Article
series African Journal of Laboratory Medicine
spelling doaj.art-599304b414584c71a254ca072a1a3ee02022-12-22T02:56:27ZengAOSISAfrican Journal of Laboratory Medicine2225-20022225-20102014-11-0132e1e610.4102/ajlm.v3i2.24873Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitatorsEdwin Shumba0Phoebe Nzombe1Absolom Mbinda2Raiva Simbi3Douglas Mangwanya4Peter H. Kilmarx5Elizabeth T. Luman6Sibongile N. Zimuto7Zimbabwe National Quality Assurance Programme (ZINQAP) TrustZimbabwe National Quality Assurance Programme (ZINQAP) TrustZimbabwe National Quality Assurance Programme (ZINQAP) TrustMinistry of Health and Child Welfare (MoHCW)Ministry of Health and Child Welfare (MoHCW)US Centers for Disease Control and Prevention (CDC)U.S. Centres for Disease Control and Prevention (CDC)Zimbabwe National Quality Assurance Programme (ZINQAP) TrustBackground: In 2010, the Zimbabwe Ministry of Health and Child Welfare (MoHCW) adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme as a tool for laboratory quality systems strengthening. Objectives: To evaluate the financial costs of SLMTA implementation using two models (external facilitators; and internal local or MoHCW facilitators) from the perspective of the implementing partner and to estimate resources needed to scale up the programme nationally in all 10 provinces. Methods: The average expenditure per laboratory was calculated based on accounting records; calculations included implementing partner expenses but excluded in-kind contributions and salaries of local facilitators and trainees. We also estimated theoretical financial costs, keeping all contextual variables constant across the two models. Resource needs for future national expansion were estimated based on a two-phase implementation plan, in which 12 laboratories in each of five provinces would implement SLMTA per phase; for the internal facilitator model, 20 facilitators would be trained at the beginning of each phase. Results: The average expenditure to implement SLMTA in 11 laboratories using external facilitators was approximately US$5800 per laboratory; expenditure in 19 laboratories using internal facilitators was approximately $6000 per laboratory. The theoretical financial cost of implementing a 12-laboratory SLMTA cohort keeping all contextual variables constant would be approximately $58 000 using external facilitators; or $15 000 using internal facilitators, plus $86 000 to train 20 facilitators. The financial cost for subsequent SLMTA cohorts using the previously-trained internal facilitators would be approximately $15 000, yielding a break-even point of 2 cohorts, at $116 000 for either model. Estimated resources required for national implementation in 120 laboratories would therefore be $580 000 using external facilitators ($58 000 per province) and $322 000 using internal facilitators ($86 000 for facilitator training in each of two phases plus $15 000 for SLMTA implementation in each province). Conclusion: Investing in training of internal facilitators will result in substantial savings over the scale-up of the programme. Our study provides information to assist policy makers to develop strategic plans for investing in laboratory strengthening.https://ajlmonline.org/index.php/ajlm/article/view/248
spellingShingle Edwin Shumba
Phoebe Nzombe
Absolom Mbinda
Raiva Simbi
Douglas Mangwanya
Peter H. Kilmarx
Elizabeth T. Luman
Sibongile N. Zimuto
Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
African Journal of Laboratory Medicine
title Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
title_full Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
title_fullStr Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
title_full_unstemmed Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
title_short Weighing the costs: Implementing the SLMTA programme in Zimbabwe using internal versus external facilitators
title_sort weighing the costs implementing the slmta programme in zimbabwe using internal versus external facilitators
url https://ajlmonline.org/index.php/ajlm/article/view/248
work_keys_str_mv AT edwinshumba weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT phoebenzombe weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT absolommbinda weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT raivasimbi weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT douglasmangwanya weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT peterhkilmarx weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT elizabethtluman weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators
AT sibongilenzimuto weighingthecostsimplementingtheslmtaprogrammeinzimbabweusinginternalversusexternalfacilitators