Analisis Percepatan Aktifitas Pada Proyek Jalan Dengan Menggunakan Metode Fast Track , Crash Program, Dan What-If
Implementation of road projects southern cross wawar - congot purworejo central java at week 27 is delayed. From 53.41% is only realized 12.82%. Fast track method, the program crashes, and what if is used to accelerate the implementation of delayed project. The purpose of this study is to determine...
Main Authors: | Andrea Saputra A. P., As’ad Munawir, Indradi Wijatmiko |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2017-07-01
|
Series: | Rekayasa Sipil |
Online Access: | http://rekayasasipil.ub.ac.id/index.php/rs/article/view/398 |
Similar Items
-
Analisis Percepatan Proyek Menggunakan Metode Crashing dengan Sistem Shift Kerja pada Proyek Pembangunan PHO DRYER PT. XYZ
by: Maulana, Andika Akhmad, et al.
Published: (2021) -
Pemodelan Peningkatan Akurasi Estimasi Biaya Dengan Metode Structural Equation Modeling-Partial Least Square Pada Proyek Jalan Provinsi Kalimantan Tengah
by: Yanda Christian, et al.
Published: (2018-01-01) -
Optimasi Waktu dan Biaya Pelaksanaan Proyek Jalan dengan Metode Crash Program (Studi Kasus: Pemeliharaan Jalan Kecamatan Tenggarong Seberang dan Tenggarong
by: Bernardo Sandrini Salasa Sandrini Salas, et al.
Published: (2023-01-01) -
Pengaruh Variasi Mutu Beton Bertulang Terhadap Cepat Rambat Gelombang Dengan Menggunakan Metode Non Destructive Test
by: Lingga Ariya Dwisyahputra, et al.
Published: (2020-03-01) -
Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off : Studi Kasus Proyek Pembangunan Prasarana Pengendali Banjir
by: Mandiyo Priyo, et al.
Published: (2016-12-01)