Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy

The article discusses the features of running tunnels in difficult mining and geological conditions of the Saint Petersburg Metrostroy using modern tunnel boring shields of Herrenknecht company with hybrid executive bodies equipped with a incisors and rock cutters. The work of a hybrid executive bod...

Full description

Bibliographic Details
Main Authors: Dmitrii A. Yungmeister, Aleksei I. Yacheykin
Format: Article
Language:English
Published: Saint-Petersburg Mining University 2021-09-01
Series:Записки Горного института
Subjects:
Online Access:https://pmi.spmi.ru/index.php/pmi/article/view/14722?setLocale=en_US
_version_ 1797947258028687360
author Dmitrii A. Yungmeister
Aleksei I. Yacheykin
author_facet Dmitrii A. Yungmeister
Aleksei I. Yacheykin
author_sort Dmitrii A. Yungmeister
collection DOAJ
description The article discusses the features of running tunnels in difficult mining and geological conditions of the Saint Petersburg Metrostroy using modern tunnel boring shields of Herrenknecht company with hybrid executive bodies equipped with a incisors and rock cutters. The work of a hybrid executive body is analyzed when driving along a heterogeneous bottomhole massif consisting of Cambrian clay with limestone interlayers. Theoretical and experimental studies of vibroactive cones, a graphical representation of the dependence of the depth of their penetration on the axial force and axial force together with the applied shock load (the dependences of the penetration depth are interpreted as a linear dependence) have been carried out. An increase in the intensity of destruction of a heterogeneous bottomhole massif consisting of Cambrian clay and limestone interlayers using vibroactive rock-cutting tools (spiked roller) was theoretically and experimentally confirmed, while the growth of the penetration rate is determined depending on the number of their parameters. The design is considered, the principle of operation and the method of power calculation of a rotary executive body equipped with vibroactive cutters are described, on the basis of which a nomogram of the dependence of the torque and performance of the tunnel boring shield on the feed rate of the executive body to the bottom is built.
first_indexed 2024-04-10T21:23:53Z
format Article
id doaj.art-5a71c5b4490142d0ab820d1ef1fd97b8
institution Directory Open Access Journal
issn 2411-3336
2541-9404
language English
last_indexed 2024-04-10T21:23:53Z
publishDate 2021-09-01
publisher Saint-Petersburg Mining University
record_format Article
series Записки Горного института
spelling doaj.art-5a71c5b4490142d0ab820d1ef1fd97b82023-01-20T02:04:53ZengSaint-Petersburg Mining UniversityЗаписки Горного института2411-33362541-94042021-09-0124944144810.31897/PMI.2021.3.1314722Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg MetrostroyDmitrii A. Yungmeister0https://orcid.org/0000-0001-7858-8340Aleksei I. Yacheykin1https://orcid.org/0000-0002-1178-6913Saint Petersburg Mining UniversitySaint Petersburg Mining UniversityThe article discusses the features of running tunnels in difficult mining and geological conditions of the Saint Petersburg Metrostroy using modern tunnel boring shields of Herrenknecht company with hybrid executive bodies equipped with a incisors and rock cutters. The work of a hybrid executive body is analyzed when driving along a heterogeneous bottomhole massif consisting of Cambrian clay with limestone interlayers. Theoretical and experimental studies of vibroactive cones, a graphical representation of the dependence of the depth of their penetration on the axial force and axial force together with the applied shock load (the dependences of the penetration depth are interpreted as a linear dependence) have been carried out. An increase in the intensity of destruction of a heterogeneous bottomhole massif consisting of Cambrian clay and limestone interlayers using vibroactive rock-cutting tools (spiked roller) was theoretically and experimentally confirmed, while the growth of the penetration rate is determined depending on the number of their parameters. The design is considered, the principle of operation and the method of power calculation of a rotary executive body equipped with vibroactive cutters are described, on the basis of which a nomogram of the dependence of the torque and performance of the tunnel boring shield on the feed rate of the executive body to the bottom is built.https://pmi.spmi.ru/index.php/pmi/article/view/14722?setLocale=en_UStunnel boring shieldexecutive bodyincisor placement schemeclaychip thicknessvibro-shock cutter
spellingShingle Dmitrii A. Yungmeister
Aleksei I. Yacheykin
Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
Записки Горного института
tunnel boring shield
executive body
incisor placement scheme
clay
chip thickness
vibro-shock cutter
title Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
title_full Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
title_fullStr Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
title_full_unstemmed Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
title_short Rational design justification of the tunnel boring shield executive body for the conditions of the mines of Saint Petersburg Metrostroy
title_sort rational design justification of the tunnel boring shield executive body for the conditions of the mines of saint petersburg metrostroy
topic tunnel boring shield
executive body
incisor placement scheme
clay
chip thickness
vibro-shock cutter
url https://pmi.spmi.ru/index.php/pmi/article/view/14722?setLocale=en_US
work_keys_str_mv AT dmitriiayungmeister rationaldesignjustificationofthetunnelboringshieldexecutivebodyfortheconditionsoftheminesofsaintpetersburgmetrostroy
AT alekseiiyacheykin rationaldesignjustificationofthetunnelboringshieldexecutivebodyfortheconditionsoftheminesofsaintpetersburgmetrostroy