Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction

Due to the increasing demand for transportation, road renovation is inevitable, and the emergence of work zones has become the most common problem in traffic control. There are many research results on the impact of work zones on traffic operation, but most of them focus on various capacity theoreti...

Full description

Bibliographic Details
Main Authors: Ya Wang, Binghong Pan, Zilong Xie, Mengyu Shao, Mengmeng Shi, Xin Tian
Format: Article
Language:English
Published: MDPI AG 2023-12-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/13/24/13200
_version_ 1827575756805373952
author Ya Wang
Binghong Pan
Zilong Xie
Mengyu Shao
Mengmeng Shi
Xin Tian
author_facet Ya Wang
Binghong Pan
Zilong Xie
Mengyu Shao
Mengmeng Shi
Xin Tian
author_sort Ya Wang
collection DOAJ
description Due to the increasing demand for transportation, road renovation is inevitable, and the emergence of work zones has become the most common problem in traffic control. There are many research results on the impact of work zones on traffic operation, but most of them focus on various capacity theoretical models or traffic flow control strategies and are mostly concentrated in highway work areas and urban road subway construction work areas. The location of these work zones is often unable to be changed and is mostly considered reasonable. At present, there is still a gap in selecting and evaluating the location of the work zone. Therefore, this article studied a bidirectional six-lane intersection in Xi’an and investigated the situation of traffic flow distortion caused by the setting of work zones at the intersection. Two different positions and forms of work zones were designed for evaluation and analysis. Firstly, we used VISSIM (2022 student) to simulate the original and proposed work zone road-occupation schemes and analyzed six indicators. Finally, in order to determine the optimal work zone locations under different traffic situations, we applied the entropy weight method (EWM) to assign weights to multiple indicators, thereby achieving a comprehensive assessment of various schemes. The results showed that the highest improvement level among the six indicators was 50.2%, and different schemes adapted to different traffic situations. However, occupying two lanes of the median opposite the exit lane performed better under high traffic volume. Occupying the median and lanes on both sides of the median is suitable for low traffic volume. Occupying two lanes of the entrance lane and using the opposite lane as the left-turn entrance lane is suitable for situations with high traffic volume in the opposite lane.
first_indexed 2024-03-08T21:01:31Z
format Article
id doaj.art-5aa781a8fbb1478584d5ed711657cce8
institution Directory Open Access Journal
issn 2076-3417
language English
last_indexed 2024-03-08T21:01:31Z
publishDate 2023-12-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj.art-5aa781a8fbb1478584d5ed711657cce82023-12-22T13:51:50ZengMDPI AGApplied Sciences2076-34172023-12-0113241320010.3390/app132413200Evaluation of Different Work Zone Road-Occupation Schemes for Monorail ConstructionYa Wang0Binghong Pan1Zilong Xie2Mengyu Shao3Mengmeng Shi4Xin Tian5Highway Academy, Chang’an University, Xi’an 710064, ChinaHighway Academy, Chang’an University, Xi’an 710064, ChinaHighway Academy, Chang’an University, Xi’an 710064, ChinaHighway Academy, Chang’an University, Xi’an 710064, ChinaHighway Academy, Chang’an University, Xi’an 710064, ChinaHighway Academy, Chang’an University, Xi’an 710064, ChinaDue to the increasing demand for transportation, road renovation is inevitable, and the emergence of work zones has become the most common problem in traffic control. There are many research results on the impact of work zones on traffic operation, but most of them focus on various capacity theoretical models or traffic flow control strategies and are mostly concentrated in highway work areas and urban road subway construction work areas. The location of these work zones is often unable to be changed and is mostly considered reasonable. At present, there is still a gap in selecting and evaluating the location of the work zone. Therefore, this article studied a bidirectional six-lane intersection in Xi’an and investigated the situation of traffic flow distortion caused by the setting of work zones at the intersection. Two different positions and forms of work zones were designed for evaluation and analysis. Firstly, we used VISSIM (2022 student) to simulate the original and proposed work zone road-occupation schemes and analyzed six indicators. Finally, in order to determine the optimal work zone locations under different traffic situations, we applied the entropy weight method (EWM) to assign weights to multiple indicators, thereby achieving a comprehensive assessment of various schemes. The results showed that the highest improvement level among the six indicators was 50.2%, and different schemes adapted to different traffic situations. However, occupying two lanes of the median opposite the exit lane performed better under high traffic volume. Occupying the median and lanes on both sides of the median is suitable for low traffic volume. Occupying two lanes of the entrance lane and using the opposite lane as the left-turn entrance lane is suitable for situations with high traffic volume in the opposite lane.https://www.mdpi.com/2076-3417/13/24/13200work zone road-occupation schemesintersectionsimulationentropy weight methodVISSIM
spellingShingle Ya Wang
Binghong Pan
Zilong Xie
Mengyu Shao
Mengmeng Shi
Xin Tian
Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
Applied Sciences
work zone road-occupation schemes
intersection
simulation
entropy weight method
VISSIM
title Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
title_full Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
title_fullStr Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
title_full_unstemmed Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
title_short Evaluation of Different Work Zone Road-Occupation Schemes for Monorail Construction
title_sort evaluation of different work zone road occupation schemes for monorail construction
topic work zone road-occupation schemes
intersection
simulation
entropy weight method
VISSIM
url https://www.mdpi.com/2076-3417/13/24/13200
work_keys_str_mv AT yawang evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction
AT binghongpan evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction
AT zilongxie evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction
AT mengyushao evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction
AT mengmengshi evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction
AT xintian evaluationofdifferentworkzoneroadoccupationschemesformonorailconstruction