Nizhne-Suyanskiy Waterworks Facility — a long-term pending project

Introduction. In 1971, “Schedule of multi-purpose use and protection of water resources of the basin of the Belaya River” envisaged construction of a cascade of 10 waterworks facilities, subdivided in 4 sections. Nizhne-Suyanskiy Waterworks Facility was planned for construction in the third section,...

Full description

Bibliographic Details
Main Authors: Boris A. Zaytsev, Igor M. Egorov
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2019-07-01
Series:Stroitel’stvo: Nauka i Obrazovanie
Subjects:
Online Access:http://nso-journal.ru/public/journals/1/issues/2019/02/02_02_2019.pdf
_version_ 1818251626008281088
author Boris A. Zaytsev
Igor M. Egorov
author_facet Boris A. Zaytsev
Igor M. Egorov
author_sort Boris A. Zaytsev
collection DOAJ
description Introduction. In 1971, “Schedule of multi-purpose use and protection of water resources of the basin of the Belaya River” envisaged construction of a cascade of 10 waterworks facilities, subdivided in 4 sections. Nizhne-Suyanskiy Waterworks Facility was planned for construction in the third section, the most lucrative in terms of energetic utilization. However, of the three HPPs planned in this section: Varyazhskaya, Nizhne-Suyanskaya and Pavlovskaya HPP, for the time being, only Pavlovskaya HPP has been built. Nizhne-Suyanskiy Waterworks Facility had the mission to solve water household, energy and socio-economic problems. Materials and methods. Initial material for the study were the results of the “Substantiation of the investment in the construction of Nizhne-Suyanskiy Waterworks Facility in the Ufa River in the Republic of Bashkortostan” prepared by ОJSC Energy Engineering Centre of Volga Region. Based on the retrieved data, the following analyses were made: a theoretical analysis, an estimate substantiation; subsequently, conclusions were put down based on the obtained results. Results. The optimum solution is a comprehensive waterworks facility, since Nizhne-Suyanskaya HPP will allow for improvement of the electrical power supply of the consumers of the NE part of the Bashkir power supply network. The construction of Nizhne-Suyanskiy Waterworks Facility will enable the control of the water influx to the water storage basin of Pavlovskaya HPP allowing for its increased generation power. The construction of the waterworks facility is supposed to carry out in 2 stages. The first stage will be the erection of a concrete overflow weir as a single unit with the HPP building. The second stage will be the construction of a soil dam of local construction materials, that is: dam body of sand and gravel soil, PFU core of loamy soil. Simultaneously with the soil dam, on the right bank a solid blind concrete weir will be erected. Conclusions. Nizhne-Suyanskiy Waterworks Facility unfortunately was not built. Feasibility studies have demonstrated a rate of return of the waterworks facility of 12.8 %, the value being a little higher than the standard one. This justifies investment in Nizhne-Suyanskiy Waterworks Facility. The basic feasibility factors of the construction of the waterworks facility are: Federal support, project engagement of the executive authority of the Republic of Bashkortostan and PJSC RusHydro, as well as availability of free investment funds.
first_indexed 2024-12-12T16:11:16Z
format Article
id doaj.art-5ae7b98c7f0f41e0b6adcfaeaf09fd23
institution Directory Open Access Journal
issn 2305-5502
language English
last_indexed 2024-12-12T16:11:16Z
publishDate 2019-07-01
publisher Moscow State University of Civil Engineering (MGSU)
record_format Article
series Stroitel’stvo: Nauka i Obrazovanie
spelling doaj.art-5ae7b98c7f0f41e0b6adcfaeaf09fd232022-12-22T00:19:11ZengMoscow State University of Civil Engineering (MGSU)Stroitel’stvo: Nauka i Obrazovanie2305-55022019-07-01922210.22227/2305-5502.2019.2.2Nizhne-Suyanskiy Waterworks Facility — a long-term pending projectBoris A. Zaytsev0 Igor M. Egorov1Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU)Introduction. In 1971, “Schedule of multi-purpose use and protection of water resources of the basin of the Belaya River” envisaged construction of a cascade of 10 waterworks facilities, subdivided in 4 sections. Nizhne-Suyanskiy Waterworks Facility was planned for construction in the third section, the most lucrative in terms of energetic utilization. However, of the three HPPs planned in this section: Varyazhskaya, Nizhne-Suyanskaya and Pavlovskaya HPP, for the time being, only Pavlovskaya HPP has been built. Nizhne-Suyanskiy Waterworks Facility had the mission to solve water household, energy and socio-economic problems. Materials and methods. Initial material for the study were the results of the “Substantiation of the investment in the construction of Nizhne-Suyanskiy Waterworks Facility in the Ufa River in the Republic of Bashkortostan” prepared by ОJSC Energy Engineering Centre of Volga Region. Based on the retrieved data, the following analyses were made: a theoretical analysis, an estimate substantiation; subsequently, conclusions were put down based on the obtained results. Results. The optimum solution is a comprehensive waterworks facility, since Nizhne-Suyanskaya HPP will allow for improvement of the electrical power supply of the consumers of the NE part of the Bashkir power supply network. The construction of Nizhne-Suyanskiy Waterworks Facility will enable the control of the water influx to the water storage basin of Pavlovskaya HPP allowing for its increased generation power. The construction of the waterworks facility is supposed to carry out in 2 stages. The first stage will be the erection of a concrete overflow weir as a single unit with the HPP building. The second stage will be the construction of a soil dam of local construction materials, that is: dam body of sand and gravel soil, PFU core of loamy soil. Simultaneously with the soil dam, on the right bank a solid blind concrete weir will be erected. Conclusions. Nizhne-Suyanskiy Waterworks Facility unfortunately was not built. Feasibility studies have demonstrated a rate of return of the waterworks facility of 12.8 %, the value being a little higher than the standard one. This justifies investment in Nizhne-Suyanskiy Waterworks Facility. The basic feasibility factors of the construction of the waterworks facility are: Federal support, project engagement of the executive authority of the Republic of Bashkortostan and PJSC RusHydro, as well as availability of free investment funds.http://nso-journal.ru/public/journals/1/issues/2019/02/02_02_2019.pdfwaterworks facilityprojectconstructionsoil damhydroelectric power plant (HPP)storage basin
spellingShingle Boris A. Zaytsev
Igor M. Egorov
Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
Stroitel’stvo: Nauka i Obrazovanie
waterworks facility
project
construction
soil dam
hydroelectric power plant (HPP)
storage basin
title Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
title_full Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
title_fullStr Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
title_full_unstemmed Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
title_short Nizhne-Suyanskiy Waterworks Facility — a long-term pending project
title_sort nizhne suyanskiy waterworks facility a long term pending project
topic waterworks facility
project
construction
soil dam
hydroelectric power plant (HPP)
storage basin
url http://nso-journal.ru/public/journals/1/issues/2019/02/02_02_2019.pdf
work_keys_str_mv AT borisazaytsev nizhnesuyanskiywaterworksfacilityalongtermpendingproject
AT igormegorov nizhnesuyanskiywaterworksfacilityalongtermpendingproject