Enhancement of a seepage control facility of an earth-filled dam that has a concrete face and a cutoff wall
Introduction. When a rockfill dam with a concrete face is constructed on the earth foundation, its seepage control facility is complemented by a cutoff wall and an apron. Together they represent a complicated integrated seepage control facility. The performance of an integrated seepage control facil...
Main Authors: | Mikhail P. Sainov, Vladislav B. Soroka |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2022-02-01
|
Series: | Stroitel’stvo: Nauka i Obrazovanie |
Subjects: | |
Online Access: | https://www.nso-journal.ru/jour/article/view/57 |
Similar Items
-
Concrete face rockfill dam located on deformed foundation: stress-strain state
by: Sainov Mikhail
Published: (2023-12-01) -
Study of Seepage Flow and Cutoff Wall Performance of Eyvashan Earth Dam Using Numerical Analysis
by: Mehdi Komasi, et al.
Published: (2020-12-01) -
THE EFFECT OF CUTOFF WALL ANGLE ON SEEPAGE UNDER DAMS
by: Zainal, Abdul Kareem Esmat
Published: (2011-10-01) -
Assessment of the Optimum Depth of Sealing Cutoff Walls in the Clay Core of Peygham-Chay Dam
by: Hadi Farhadian, et al.
Published: (2021-05-01) -
Concrete face rockfill dams /
by: Cruz, Paulo T., et al.
Published: (c200)