Mooring System Transport and Installation Logistics for a Floating Offshore Wind Farm in Lannion, France

This study addresses the planning procedures for the installation of the mooring systems that support the floating offshore wind turbines in a wind farm. It considers the logistics of the installation process and discusses the important role of the weather windows in the planning of those operations...

Olles dieđut

Bibliográfalaš dieđut
Váldodahkkit: Jorge Altuzarra, Alberto Herrera, Onintze Matías, Joaquín Urbano, Cristina Romero, Shan Wang, C. Guedes Soares
Materiálatiipa: Artihkal
Giella:English
Almmustuhtton: MDPI AG 2022-09-01
Ráidu:Journal of Marine Science and Engineering
Fáttát:
Liŋkkat:https://www.mdpi.com/2077-1312/10/10/1354
Govvádus
Čoahkkáigeassu:This study addresses the planning procedures for the installation of the mooring systems that support the floating offshore wind turbines in a wind farm. It considers the logistics of the installation process and discusses the important role of the weather windows in the planning of those operations at a preliminary stage of the project. The case study is based on a wind farm array of 47 Telwind floating wind turbine platforms, to be located in Lannion (France), with a potential of 470 MW. The study includes the transport and logistics requirements of different mooring components, such as chains, connectors and drag anchors; the description of the installation operations considering the typology of vessels that are necessary in these manoeuvres; as well as the planning and costs associated with the transport and installation. Given the diversity of elements and operations involved in the installation procedure, it is demonstrated that the research results of duration and costs of this type of operations are only possible to obtain using a simulation tool.
ISSN:2077-1312