Robust Scheduling of a Hybrid Hydro/Photovoltaic/Pumped-Storage System for Multiple Grids Peak-Shaving and Congestion Management
Southwest China possesses substantial hydropower potential and abundant solar resources. To harness these renewable resources effectively, extensive photovoltaic (PV) facilities and cascaded hydropower stations have been strategically constructed in mountainous regions, culminating in the developmen...
Main Authors: | Hong Zhou, Liang Lu, Mingkui Wei, Li Shen, Youbo Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2024-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/10373029/ |
Similar Items
-
Daily peak shaving operation of mixed pumped-storage hydro plants considering cascade hydraulic coupling
by: Xiaohui Ge, et al.
Published: (2023-10-01) -
A New Peak-Shaving Model Based on Mixed Integer Linear Programming with Variable Peak-Shaving Order
by: Xianliang Cheng, et al.
Published: (2021-02-01) -
Optimal operating scenario for Polerood hydropower station to maximize peak shaving and produced profit
by: Behzad Forouzi Feshalami
Published: (2018-12-01) -
Industrial Application of Photovoltaic Systems with Storage for Peak Shaving: Ecuador Case Study
by: Jesús Guamán-Molina, et al.
Published: (2023-12-01) -
Optimization Model for the Long-Term Operation of an Interprovincial Hydropower Plant Incorporating Peak Shaving Demands
by: Rui Cao, et al.
Published: (2020-09-01)