Indicators for Takt Production Performance Assessment—A Conceptual Study
This conceptual study aims to produce rough analysis methods and visualizations for production data (formatted in time, location, and work) that can be collected from construction sites that utilize takt production. The scope is on creating methods for evaluating the soundness of the takt plan and i...
Main Authors: | Kimmo Keskiniva, Arto Saari, Juha-Matti Junnonen |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-12-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/14/1/50 |
Similar Items
-
Takt Production Monitoring and Control in Apartment Renovation Projects
by: Kimmo Keskiniva, et al.
Published: (2021-03-01) -
Takt Planning in Apartment Building Renovation Projects
by: Kimmo Keskiniva, et al.
Published: (2020-12-01) -
Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study
by: Kozlovská Mária, et al.
Published: (2023-12-01) -
Herbart om oppdragelse, formbarhet og takt
by: Lars Løvlie
Published: (2015-04-01) -
Combining decentralized decision-making and takt production in construction planning and control to increase production flow
by: Joonas Lehtovaara, et al.
Published: (2022-09-01)