Short-term Hydro-Thermal-Wind-Solar Power Scheduling: A Case Study of Kanyakumari Region of India
In this paper, an advanced modus operandi named the -constrained simplex method (ACSM) is deployed to resolve a real-time hydro-thermal-wind-solar power scheduling problem. ACSM is an updated articulation of the Nonlinear Simplex Method (SM) of Nelder and Mead. It has been designed after interbreedi...
Main Authors: | Sunimerjit Kaur, Yadwinder Singh Brar, Jaspreet Singh Dhillon |
---|---|
Format: | Article |
Language: | English |
Published: |
Diponegoro University
2021-08-01
|
Series: | International Journal of Renewable Energy Development |
Subjects: | |
Online Access: | https://ijred.cbiore.id/index.php/ijred/article/view/35558 |
Similar Items
-
Optimal Scheduling of Solar-Wind-Thermal Integrated System Using α-Constrained Simplex Method
by: Sunimerjit Kaur, et al.
Published: (2021-02-01) -
Multi-objective real-time integrated solar-wind-thermal power dispatch by using meta-heuristic technique
by: Sunimerjit Kaur, et al.
Published: (2022-08-01) -
Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
by: M. R. Behnamfar, et al.
Published: (2020-12-01) -
Power Generation Scheduling for a Hydro-Wind-Solar Hybrid System: A Systematic Survey and Prospect
by: Chaoyang Chen, et al.
Published: (2022-11-01) -
MILP Based Robust Short-Term Scheduling for Wind–Thermal–Hydro Power System With Pumped Hydro Energy Storage
by: Pei Xia, et al.
Published: (2019-01-01)