Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability
Multi-skilled resources have brought more flexibility to resource scheduling and have been a key factor in the research of resource-constrained project scheduling problems. However, existing studies are mainly limited to deterministic problems and neglect some uncertainties such as resource breakdow...
Main Authors: | Min Wang, Guoshan Liu, Xinyu Lin |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-08-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/10/17/3070 |
Similar Items
-
Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
by: Saeed Akbar, et al.
Published: (2024-01-01) -
Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems
by: Muritala Adebayo Isah, et al.
Published: (2021-01-01) -
Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
by: Wuliang Peng, et al.
Published: (2023-01-01) -
The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes
by: Bahroun Zied, et al.
Published: (2024-03-01) -
Multi-Skills Resource Constrained and Personality Traits Based Project Scheduling
by: Saeed Akbar, et al.
Published: (2022-01-01)