Shortening start-up and an extension of the power unit load range
A power plant with additional water pressure tanks was proposed. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters was determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumul...
Main Authors: | Taler Jan, Trojan Marcin, Taler Dawid, Dzierwa Piotr, Kaczmarski Karol |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20171401022 |
Similar Items
-
The use of a solution of the inverse heat conduction problem to monitor thermal stresses
by: Taler Jan, et al.
Published: (2019-01-01) -
Analysis of the Causes of the Emergency Shutdown of Natural Gas-Fired Water Peak Boilers at the Large Municipal Combined Heat and Power Plant
by: Marcin Trojan, et al.
Published: (2023-08-01) -
Transient numerical analysis of charging a heat accumulator in a combined heat and power plant
by: Dzierwa Piotr, et al.
Published: (2021-01-01) -
New method for determining the optimum fluid temperature when heating pressure thick-walled components with openings
by: Taler Dawid, et al.
Published: (2019-01-01) -
Determination of Transient Fluid Temperature and Thermal Stresses in Pressure Thick-Walled Elements Using a New Design Thermometer
by: Magdalena Jaremkiewicz, et al.
Published: (2019-01-01)