Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach

Resource constrained project scheduling problems (RCPSPs) are complex optimization problems that aim to minimize project completion time after considering limited resources and precedence-related activities with known durations. However, due to the dynamic nature of real-world applications, activity...

Full description

Bibliographic Details
Main Authors: Md. Humyun Fuad Rahman, Ripon K. Chakrabortty, Michael J. Ryan
Format: Article
Language:English
Published: IEEE 2021-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9369353/
_version_ 1818614287593111552
author Md. Humyun Fuad Rahman
Ripon K. Chakrabortty
Michael J. Ryan
author_facet Md. Humyun Fuad Rahman
Ripon K. Chakrabortty
Michael J. Ryan
author_sort Md. Humyun Fuad Rahman
collection DOAJ
description Resource constrained project scheduling problems (RCPSPs) are complex optimization problems that aim to minimize project completion time after considering limited resources and precedence-related activities with known durations. However, due to the dynamic nature of real-world applications, activity durations are vulnerable to change. In addition, resource demands along with resource availability at any stage of a project can also vary due to disruptions, which compel practitioners to re-think existing scheduling methodologies. Consequently, to mitigate the conjoint effect of those uncertainties and/or disruptions, this paper proposes a real-time reactive scheduling approach. To deal with uncertain activity durations, a chance constrained based approach is followed, which is later solved by an advanced meta-heuristic based approaches called IGFBIS and IGFBID. After solving an exhaustive list of stochastic RCPSP instances, this paper proves the efficacy of the proposed approaches, which is proven to be more useful to mitigate uncertainty or disruption while executing real-life projects.
first_indexed 2024-12-16T16:15:37Z
format Article
id doaj.art-5d4fa9548271423c85174752f2ee3f57
institution Directory Open Access Journal
issn 2169-3536
language English
last_indexed 2024-12-16T16:15:37Z
publishDate 2021-01-01
publisher IEEE
record_format Article
series IEEE Access
spelling doaj.art-5d4fa9548271423c85174752f2ee3f572022-12-21T22:25:07ZengIEEEIEEE Access2169-35362021-01-019455624558610.1109/ACCESS.2021.30637669369353Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive ApproachMd. Humyun Fuad Rahman0https://orcid.org/0000-0002-6097-7978Ripon K. Chakrabortty1https://orcid.org/0000-0002-7373-0149Michael J. Ryan2https://orcid.org/0000-0002-6335-3773Capability Systems Centre, School of Engineering and Information Technology, UNSW Canberra at ADFA, Campbell, ACT, AustraliaCapability Systems Centre, School of Engineering and Information Technology, UNSW Canberra at ADFA, Campbell, ACT, AustraliaCapability Systems Centre, School of Engineering and Information Technology, UNSW Canberra at ADFA, Campbell, ACT, AustraliaResource constrained project scheduling problems (RCPSPs) are complex optimization problems that aim to minimize project completion time after considering limited resources and precedence-related activities with known durations. However, due to the dynamic nature of real-world applications, activity durations are vulnerable to change. In addition, resource demands along with resource availability at any stage of a project can also vary due to disruptions, which compel practitioners to re-think existing scheduling methodologies. Consequently, to mitigate the conjoint effect of those uncertainties and/or disruptions, this paper proposes a real-time reactive scheduling approach. To deal with uncertain activity durations, a chance constrained based approach is followed, which is later solved by an advanced meta-heuristic based approaches called IGFBIS and IGFBID. After solving an exhaustive list of stochastic RCPSP instances, this paper proves the efficacy of the proposed approaches, which is proven to be more useful to mitigate uncertainty or disruption while executing real-life projects.https://ieeexplore.ieee.org/document/9369353/Scheduling real-life projectsproject scheduling with uncertainty and disruptioniterated greedy algorithmchance constrained approach
spellingShingle Md. Humyun Fuad Rahman
Ripon K. Chakrabortty
Michael J. Ryan
Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
IEEE Access
Scheduling real-life projects
project scheduling with uncertainty and disruption
iterated greedy algorithm
chance constrained approach
title Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
title_full Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
title_fullStr Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
title_full_unstemmed Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
title_short Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach
title_sort managing uncertainty and disruptions in resource constrained project scheduling problems a real time reactive approach
topic Scheduling real-life projects
project scheduling with uncertainty and disruption
iterated greedy algorithm
chance constrained approach
url https://ieeexplore.ieee.org/document/9369353/
work_keys_str_mv AT mdhumyunfuadrahman managinguncertaintyanddisruptionsinresourceconstrainedprojectschedulingproblemsarealtimereactiveapproach
AT riponkchakrabortty managinguncertaintyanddisruptionsinresourceconstrainedprojectschedulingproblemsarealtimereactiveapproach
AT michaeljryan managinguncertaintyanddisruptionsinresourceconstrainedprojectschedulingproblemsarealtimereactiveapproach