PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS
When delivering goods in the warehouses of enterprises, courier and forwarding companies, and for logistics operators, loading and unloading is usually done manually or mechanically. On the other hand, the load can first be placed on the ground next to the vehicle and then accepted in the pile, o...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Silesian University of Technology
2021-12-01
|
Series: | Transport Problems |
Subjects: | |
Online Access: | http://transportproblems.polsl.pl/pl/Archiwum/2021/zeszyt4/2021t16z4_03.pdf |
_version_ | 1819125750291234816 |
---|---|
author | Asen ASENOV Velizara PENCHEVA Ivan GEORGIEV |
author_facet | Asen ASENOV Velizara PENCHEVA Ivan GEORGIEV |
author_sort | Asen ASENOV |
collection | DOAJ |
description | When delivering goods in the warehouses of enterprises, courier and
forwarding companies, and for logistics operators, loading and unloading is usually done
manually or mechanically. On the other hand, the load can first be placed on the ground
next to the vehicle and then accepted in the pile, or a ramp can be used so that it can be
delivered directly to the warehouse or vice versa. When there is a ramp, the loading and
discharging activity is performed faster and it is much easier. When there are many
vehicles serviced on ramps, it is necessary to have a free ramp available. This is often not
the case when the warehouse has more ramps and a large exchange of goods. In this case,
a time schedule is usually made for the reception and handling of vehicles, which is
communicated to carriers and drivers so that there is no unnecessary downtime of
vehicles and overloading of points with ramps. There are cases in which the established
organization of work cannot be performed due to various force majeure or other reasons,
such as delays at border crossings, bans on passing through certain sections, change in the
working hours of warehouses, pandemic and other reasons. The vehicles then arrive at
the checkpoints at a time that is different from their schedule and have to wait to be
serviced. Waiting at the unloading points makes drivers nervous and they become
dissatisfied with the working conditions. In this respect, a solution has been proposed
based on the working hours and occupancy of the loading and discharging point and the
time of arrival of the vehicles at the point, and how to receive the vehicles so that the
waiting time between them is the shortest. For this purpose, a partially integer linear
optimization model has been created in Matlab, which provides a valid plan with the
shortest waiting times for all vehicles. Simulations have been made for different numbers
of ramps and vehicles. The results show that the model is suitable for pre-creating a valid
plan for the operation of the vehicle warehouse, if any, with a minimum waiting time. |
first_indexed | 2024-12-22T07:45:06Z |
format | Article |
id | doaj.art-5d5b74b4a41b43a687fe618e08f41469 |
institution | Directory Open Access Journal |
issn | 1896-0596 2300-861X |
language | English |
last_indexed | 2024-12-22T07:45:06Z |
publishDate | 2021-12-01 |
publisher | Silesian University of Technology |
record_format | Article |
series | Transport Problems |
spelling | doaj.art-5d5b74b4a41b43a687fe618e08f414692022-12-21T18:33:40ZengSilesian University of TechnologyTransport Problems1896-05962300-861X2021-12-01164233410.21307/tp-2021-057PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTSAsen ASENOV0Velizara PENCHEVA1Ivan GEORGIEV2University of Ruse “Angel Kanchev”University of Ruse “Angel Kanchev”University of Ruse “Angel Kanchev”When delivering goods in the warehouses of enterprises, courier and forwarding companies, and for logistics operators, loading and unloading is usually done manually or mechanically. On the other hand, the load can first be placed on the ground next to the vehicle and then accepted in the pile, or a ramp can be used so that it can be delivered directly to the warehouse or vice versa. When there is a ramp, the loading and discharging activity is performed faster and it is much easier. When there are many vehicles serviced on ramps, it is necessary to have a free ramp available. This is often not the case when the warehouse has more ramps and a large exchange of goods. In this case, a time schedule is usually made for the reception and handling of vehicles, which is communicated to carriers and drivers so that there is no unnecessary downtime of vehicles and overloading of points with ramps. There are cases in which the established organization of work cannot be performed due to various force majeure or other reasons, such as delays at border crossings, bans on passing through certain sections, change in the working hours of warehouses, pandemic and other reasons. The vehicles then arrive at the checkpoints at a time that is different from their schedule and have to wait to be serviced. Waiting at the unloading points makes drivers nervous and they become dissatisfied with the working conditions. In this respect, a solution has been proposed based on the working hours and occupancy of the loading and discharging point and the time of arrival of the vehicles at the point, and how to receive the vehicles so that the waiting time between them is the shortest. For this purpose, a partially integer linear optimization model has been created in Matlab, which provides a valid plan with the shortest waiting times for all vehicles. Simulations have been made for different numbers of ramps and vehicles. The results show that the model is suitable for pre-creating a valid plan for the operation of the vehicle warehouse, if any, with a minimum waiting time.http://transportproblems.polsl.pl/pl/Archiwum/2021/zeszyt4/2021t16z4_03.pdfvehiclesoptimizationwarehousetransceiver pointsramps |
spellingShingle | Asen ASENOV Velizara PENCHEVA Ivan GEORGIEV PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS Transport Problems vehicles optimization warehouse transceiver points ramps |
title | PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS |
title_full | PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS |
title_fullStr | PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS |
title_full_unstemmed | PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS |
title_short | PLANNING AND MODELING OF THE TIME FOR ACCEPTANCE AND STAY OF VEHICLES AT THE LOADING AND DISCHARGING POINTS |
title_sort | planning and modeling of the time for acceptance and stay of vehicles at the loading and discharging points |
topic | vehicles optimization warehouse transceiver points ramps |
url | http://transportproblems.polsl.pl/pl/Archiwum/2021/zeszyt4/2021t16z4_03.pdf |
work_keys_str_mv | AT asenasenov planningandmodelingofthetimeforacceptanceandstayofvehiclesattheloadinganddischargingpoints AT velizarapencheva planningandmodelingofthetimeforacceptanceandstayofvehiclesattheloadinganddischargingpoints AT ivangeorgiev planningandmodelingofthetimeforacceptanceandstayofvehiclesattheloadinganddischargingpoints |