7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying
There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but the data collected from previously completed pro...
Main Authors: | Hubert Anysz, Jerzy Rosłon, Andrzej Foremny |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-01-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/12/2/844 |
Similar Items
-
Low complexity hybrid layered tabu-likelihood ascent search for large MIMO detection with perfect and estimated channel state information
by: Sourav Chakraborty, et al.
Published: (2023-06-01) -
BatTS: a hybrid method for optimizing deep feedforward neural network
by: Sichen Pan, et al.
Published: (2023-01-01) -
MINIMASI WAKTU PENGERJAAN PRODUK MELANIE SLEIGH CHANGING TABLE MELALUI PENDEKATAN SIMULASI DAN TABU SEARCH
by: Natalia Sofyan, et al.
Published: (2006-01-01) -
Solução de problemas de planejamento florestal com restrições de inteireza utilizando busca tabu Solving forest management problems with integer constraints using tabu search
by: Flávio Lopes Rodrigues, et al.
Published: (2003-10-01) -
Composite Lamina Model Design with the Use of Heuristic Optimization
by: Artem Balashov, et al.
Published: (2023-01-01)